Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 4.45 Mt | 0.73% | 0.03 Mt Cu | 27 Jan 2023 |
| Inferred | 1.23 Mt | 1.34% | 0.02 Mt Cu | 27 Jan 2023 |
| Total Resources | 5.68 Mt | 0.86% | 0.05 Mt Cu | 27 Jan 2023 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (% Co) | Contained (Mt Co) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 4.45 Mt | 0.19% | 0.01 Mt Co | 27 Jan 2023 |
| Inferred | 1.23 Mt | 0.08% | 0.94 kt Co | 27 Jan 2023 |
| Total Resources | 5.68 Mt | 0.17% | 0.01 Mt Co | 27 Jan 2023 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Cu | Co | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|
| Grade (% Cu) | Contained (Mt Cu) | Grade (% Co) | Contained (Mt Co) | |||||
| Indicated | 4.45 Mt | 0.73% | 0.03 Mt Cu | 0.19% | 0.01 Mt Co | 27 Jan 2023 | 2023 Mineral Resource Estimate of the Iron Creek Cobalt-Copper Project at $87 net smelter return /t Cut-offUnverified | |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
notes (4)Ref: 2023 Mineral Resource Estimate of the Iron Creek Cobalt-Copper Project at $87 net smelter return /t Cut-off
QA notes:
|
| Inferred | 1.23 Mt | 1.34% | 0.02 Mt Cu | 0.08% | 0.94 kt Co | 27 Jan 2023 | 2023 Mineral Resource Estimate of the Iron Creek Cobalt-Copper Project at $87 net smelter return /t Cut-offUnverified | notes (4)Ref: 2023 Mineral Resource Estimate of the Iron Creek Cobalt-Copper Project at $87 net smelter return /t Cut-off
QA notes:
|
| Total Resources | 5.68 Mt | 0.86% | 0.05 Mt Cu | 0.17% | 0.01 Mt Co | 27 Jan 2023 | derived from 2 rows | — |