Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | 2.60 Mt | 1.05% | 0.03 Mt Cu | 31 Dec 2025 |
| Indicated | 69.60 Mt | 1.18% | 0.82 Mt Cu | 31 Dec 2025 |
| Inferred | 696.00 Mt | 1.14% | 7.93 Mt Cu | 31 Dec 2025 |
| Total Resources | 768.20 Mt | 1.14% | 8.78 Mt Cu | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (% Ni) | Contained (Mt Ni) | As at |
|---|---|---|---|---|
| Measured | 2.60 Mt | 1.33% | 0.03 Mt Ni | 31 Dec 2025 |
| Indicated | 69.60 Mt | 1.35% | 0.94 Mt Ni | 31 Dec 2025 |
| Inferred | 696.00 Mt | 1.29% | 8.98 Mt Ni | 31 Dec 2025 |
| Total Resources | 768.20 Mt | 1.30% | 9.95 Mt Ni | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable |
| Category | Tonnes (Mt) | Grade (% Co) | Contained (Mt Co) | As at |
|---|---|---|---|---|
| Measured | 2.60 Mt | 0.23% | 0.01 Mt Co | 31 Dec 2025 |
| Indicated | 69.60 Mt | 0.21% | 0.15 Mt Co | 31 Dec 2025 |
| Inferred | 696.00 Mt | 0.20% | 1.39 Mt Co | 31 Dec 2025 |
| Total Resources | 768.20 Mt | 0.20% | 1.54 Mt Co | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Cu | Ni | Co | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|
| Grade (% Cu) | Contained (Mt Cu) | Grade (% Ni) | Contained (Mt Ni) | Grade (% Co) | Contained (Mt Co) | |||||
| Measured | 2.60 Mt | 1.05% | 0.03 Mt Cu | 1.33% | 0.03 Mt Ni | 0.23% | 0.01 Mt Co | 31 Dec 2025 | ||
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
notes (4)Ref: Mineral Resource Estimate December 31, 2025, In-Situ, for the TOML Contract Area within the CCZ at a 4 kg/m2 nodule abundance cut-off
QA notes:
|
| Indicated | 69.60 Mt | 1.18% | 0.82 Mt Cu | 1.35% | 0.94 Mt Ni | 0.21% | 0.15 Mt Co | 31 Dec 2025 | Mineral Resource Estimate December 31, 2025, In-Situ, for the TOML Contract Area within the CCZ at a 4 kg/m2 nodule abundance cut-offUnverified | notes (4)Ref: Mineral Resource Estimate December 31, 2025, In-Situ, for the TOML Contract Area within the CCZ at a 4 kg/m2 nodule abundance cut-off
QA notes:
|
| Inferred | 696.00 Mt | 1.14% | 7.93 Mt Cu | 1.29% | 8.98 Mt Ni | 0.20% | 1.39 Mt Co | 31 Dec 2025 | Mineral Resource Estimate December 31, 2025, In-Situ, for the TOML Contract Area within the CCZ at a 4 kg/m2 nodule abundance cut-offUnverified | notes (4)Ref: Mineral Resource Estimate December 31, 2025, In-Situ, for the TOML Contract Area within the CCZ at a 4 kg/m2 nodule abundance cut-off
QA notes:
|
| Total Resources | 768.20 Mt | 1.14% | 8.78 Mt Cu | 1.30% | 9.95 Mt Ni | 0.20% | 1.54 Mt Co | 31 Dec 2025 | derived from 3 rows
| — |