These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | 46.67 Mt | 3.04 g/t | 4.44 Moz | 31 Dec 2025 |
| Indicated | 155.56 Mt | 2.71 g/t | 13.56 Moz | 31 Dec 2025 |
| Inferred | 48.89 Mt | 2.10 g/t | 3.33 Moz | 31 Dec 2025 |
| Total Resources | 140.00 Mt | 2.37 g/t | 10.67 Moz | 31 Dec 2025 |
| Proved | 29.78 Mt | 3.13 g/t | 3.02 Moz | 31 Dec 2025 |
| Probable | 82.22 Mt | 2.91 g/t | 7.56 Moz | 31 Dec 2025 |
| Total Reserves | 111.11 Mt | 2.97 g/t | 10.67 Moz | 31 Dec 2025 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Measured | 46.67 Mt | 3.04 g/t | 4.44 Moz | 31 Dec 2025 | Gold Mineral Resources table — Kibali (45.00%) totalUnverified | |
notes (5)Ref: Gold Mineral Resources table — Kibali (45.00%) total
QA notes:
|
| Total | Indicated | 155.56 Mt | 2.71 g/t | 13.56 Moz | 31 Dec 2025 | Gold Mineral Resources table — Kibali (45.00%) totalUnverified | notes (4)Ref: Gold Mineral Resources table — Kibali (45.00%) total
|
| Total | Inferred | 48.89 Mt | 2.10 g/t | 3.33 Moz | 31 Dec 2025 | Gold Mineral Resources table — Kibali (45.00%) totalUnverified | notes (4)Ref: Gold Mineral Resources table — Kibali (45.00%) total
|
| Total | Total Resources | 140.00 Mt | 2.37 g/t | 10.67 Moz | 31 Dec 2025 | derived from 3 rows | — |
| surface | Measured | 24.44 Mt | 2.04 g/t | 1.56 Moz | 31 Dec 2025 | Gold Mineral Resources tableUnverified | notes (5)Ref: Gold Mineral Resources table
QA notes:
|
| surface | Indicated | 84.44 Mt | 2.17 g/t | 5.78 Moz | 31 Dec 2025 | Gold Mineral Resources tableUnverified | notes (5)Ref: Gold Mineral Resources table
QA notes:
|
| surface | Inferred | 40.00 Mt | 2.00 g/t | 2.44 Moz | 31 Dec 2025 | Gold Mineral Resources tableUnverified | notes (5)Ref: Gold Mineral Resources table
QA notes:
|
| underground | Measured | 22.22 Mt | 4.09 g/t | 2.89 Moz | 31 Dec 2025 | Gold Mineral Resources tableUnverified | notes (5)Ref: Gold Mineral Resources table
QA notes:
|
| underground | Indicated | 71.11 Mt | 3.35 g/t | 7.56 Moz | 31 Dec 2025 | Gold Mineral Resources tableUnverified | notes (5)Ref: Gold Mineral Resources table
QA notes:
|
| underground | Inferred | 10.00 Mt | 2.40 g/t | 0.78 Moz | 31 Dec 2025 | Gold Mineral Resources tableUnverified | notes (4)Ref: Gold Mineral Resources table
|
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Total Reserves | 111.11 Mt | 2.97 g/t | 10.67 Moz | 31 Dec 2025 | Gold Mineral Reserves table — Kibali (45.00%) totalUnverified | notes (4)Ref: Gold Mineral Reserves table — Kibali (45.00%) total
QA notes:
|
| surface | Proved | 15.56 Mt | 2.17 g/t | 1.09 Moz | 31 Dec 2025 | Gold Mineral Reserves tableUnverified | notes (4)Ref: Gold Mineral Reserves table
|
| surface | Probable | 46.67 Mt | 2.28 g/t | 3.33 Moz | 31 Dec 2025 | Gold Mineral Reserves tableUnverified | notes (4) |
| underground | Proved | 14.22 Mt | 4.19 g/t | 1.93 Moz | 31 Dec 2025 | Gold Mineral Reserves tableUnverified | notes (4)Ref: Gold Mineral Reserves table |
| underground | Probable | 35.56 Mt | 3.74 g/t | 4.22 Moz | 31 Dec 2025 | Gold Mineral Reserves tableUnverified | notes (4) |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.
Figures are on a 100% project basis unless a row carries the attrib chip; BARRICK MINING CORP holds 45.0% of this project.