These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 3,600.00 Mt | 0.25 g/t | 30.00 Moz | 31 Dec 2025 |
| Inferred | 1,320.00 Mt | 0.20 g/t | 8.20 Moz | 31 Dec 2025 |
| Total Resources | 2,120.00 Mt | 0.18 g/t | 12.20 Moz | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | 2,800.00 Mt | 0.28 g/t | 26.00 Moz | 31 Dec 2025 |
| Total Reserves | 2,800.00 Mt | 0.28 g/t | 26.00 Moz | 31 Dec 2025 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 4,000.00 Mt | 0.43% | 17.00 Mt Cu | 31 Dec 2025 |
| Inferred | 1,440.00 Mt | 0.30% | 4.80 Mt Cu | 31 Dec 2025 |
| Total Resources | 2,440.00 Mt | 0.30% | 7.20 Mt Cu | 31 Dec 2025 |
| Proved |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | Cu | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (% Cu) | Contained (Mt Cu) | ||||||
| Total | Total Resources | 2,120.00–2,440.00 Mt | 0.18 g/t | 12.20 Moz | |||||
| — |
| — |
| — |
| Probable | 3,000.00 Mt | 0.48% | 14.60 Mt Cu | 31 Dec 2025 |
| Total Reserves | 3,000.00 Mt | 0.48% | 14.60 Mt Cu | 31 Dec 2025 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
| 7.20 Mt Cu |
| 31 Dec 2025 |
derived from 2 rows
|
| — |
| surface | Indicated | 3,600.00–4,000.00 Mt | 0.25 g/t | 30.00 Moz | 0.43% | 17.00 Mt Cu | 31 Dec 2025 | Copper Mineral Resources tableUnverified | notes (5)Ref: Copper Mineral Resources table
QA notes:
|
| surface | Inferred | 1,320.00–1,440.00 Mt | 0.20 g/t | 8.20 Moz | 0.30% | 4.80 Mt Cu | 31 Dec 2025 | Copper Mineral Resources tableUnverified | notes (5)Ref: Copper Mineral Resources table
QA notes:
|
| Area | Category | Tonnes (Mt) | Au | Cu | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (% Cu) | Contained (Mt Cu) | ||||||
| surface | Probable | 2,800.00–3,000.00 Mt | 0.28 g/t | 26.00 Moz | 0.48% | 14.60 Mt Cu | 31 Dec 2025 | Gold Mineral Reserves tableUnverified | notes (4)Ref: Gold Mineral Reserves table
QA notes:
|
| surface | Total Reserves | 2,800.00–3,000.00 Mt | 0.28 g/t | 26.00 Moz | 0.48% | 14.60 Mt Cu | 31 Dec 2025 | Copper Mineral Reserves table — Reko Diq surface (50.00%)Unverified | |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.
Figures are on a 100% project basis unless a row carries the attrib chip; BARRICK MINING CORP holds 50.0% of this project.
notes (4)Ref: Copper Mineral Reserves table — Reko Diq surface (50.00%)
QA notes:
|