These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | 54.00 Mt | 0.66 g/t | 1.16 Moz | 31 Dec 2025 |
| Indicated | 146.00 Mt | 0.64 g/t | 3.00 Moz | 31 Dec 2025 |
| Inferred | 28.00 Mt | 0.60 g/t | 0.52 Moz | 31 Dec 2025 |
| Total Resources | 104.00 Mt | 0.56 g/t | 1.88 Moz | 31 Dec 2025 |
| Proved | 50.00 Mt | 0.67 g/t | 1.06 Moz | 31 Dec 2025 |
| Probable | 76.00 Mt | 0.70 g/t | 1.70 Moz | 31 Dec 2025 |
| Total Reserves | 124.00 Mt | 0.69 g/t | 2.80 Moz | 31 Dec 2025 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | 54.00 Mt | 12.50 g/t | 22.00 Moz | 31 Dec 2025 |
| Indicated | 146.00 Mt | 13.56 g/t | 64.00 Moz | 31 Dec 2025 |
| Inferred | 28.00 Mt | 13.80 g/t | 12.60 Moz | 31 Dec 2025 |
| Total Resources | 104.00 Mt | 13.34 g/t | 44.60 Moz | 31 Dec 2025 |
| Proved |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | Ag | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | ||||||
| Total | Total Resources | 104.00 Mt | 0.56 g/t | 1.88 Moz | |||||
| 12.17 g/t |
| 19.40 Moz |
| 31 Dec 2025 |
| Probable | 76.00 Mt | 13.97 g/t | 34.00 Moz | 31 Dec 2025 |
| Total Reserves | 124.00 Mt | 13.25 g/t | 54.00 Moz | 31 Dec 2025 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
| 44.60 Moz |
| 31 Dec 2025 |
derived from 3 rows
|
| — |
| surface | Measured | 54.00 Mt | 0.66 g/t | 1.16 Moz | 12.50 g/t | 22.00 Moz | 31 Dec 2025 | Gold Mineral Resources tableUnverified | notes (5)Ref: Gold Mineral Resources table
QA notes:
|
| surface | Indicated | 146.00 Mt | 0.64 g/t | 3.00 Moz | 13.56 g/t | 64.00 Moz | 31 Dec 2025 | Gold Mineral Resources tableUnverified | notes (4)Ref: Gold Mineral Resources table
|
| surface | Inferred | 28.00 Mt | 0.60 g/t | 0.52 Moz | 13.80 g/t | 12.60 Moz | 31 Dec 2025 | 40-F: 40-F — d833573dex991.htm (AIF exhibit)Unverified | notes (4)
QA notes:
|
| Area | Category | Tonnes (Mt) | Au | Ag | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | ||||||
| surface | Proved | 50.00 Mt | 0.67 g/t | 1.06 Moz | 12.17 g/t | 19.40 Moz | 31 Dec 2025 | Silver Mineral Reserves tableUnverified | notes (4)Ref: Silver Mineral Reserves table
QA notes:
|
| surface | Probable | 76.00 Mt | 0.70 g/t | 1.70 Moz | 13.97 g/t | 34.00 Moz | 31 Dec 2025 | Silver Mineral Reserves tableUnverified | notes (4) |
| surface | Total Reserves | 124.00 Mt | 0.69 g/t | 2.80 Moz | 13.25 g/t | 54.00 Moz | 31 Dec 2025 | Silver Mineral Reserves table — Veladero surface (50.00%)Unverified | notes (4)Source: |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.
Figures are on a 100% project basis unless a row carries the attrib chip; BARRICK MINING CORP holds 50.0% of this project.