Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | 648.00 Mt | 0.25 g/t | 5.21 Moz | 30 June 2026 |
| Indicated | 3,540.00 Mt | 0.27 g/t | 30.73 Moz | 30 June 2026 |
| M&I = Measured + Indicated (overlaps both) | 4,180.00 Mt | 0.27 g/t | 36.29 Moz | 30 June 2026 |
| Inferred | 10,600.00 Mt | 0.18 g/t | 61.34 Moz | 30 June 2026 |
| Total Resources | 14,788.00 Mt | 0.20 g/t | 97.28 Moz | 30 June 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | 648.00 Mt | 1.00 g/t | 20.83 Moz | 30 June 2026 |
| Indicated | 3,540.00 Mt | 6.00 g/t | 682.88 Moz | 30 June 2026 |
| M&I = Measured + Indicated (overlaps both) | 4,180.00 Mt | 5.00 g/t | 671.95 Moz | 30 June 2026 |
| Inferred | 10,600.00 Mt | 3.00 g/t | 1,022.39 Moz | 30 June 2026 |
| Total Resources |
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | 648.00 Mt | 0.33% | 2.14 Mt Cu | 30 June 2026 |
| Indicated | 3,540.00 Mt | 0.34% | 12.04 Mt Cu | 30 June 2026 |
| M&I = Measured + Indicated (overlaps both) | 4,180.00 Mt | 0.34% | 14.21 Mt Cu | 30 June 2026 |
| Inferred | 10,600.00 Mt | 0.30% | 31.80 Mt Cu | 30 June 2026 |
| Total Resources |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Au | Ag | Cu | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Cu) | Contained (Mt Cu) | |||||
| Measured | 648.00 Mt | 0.25 g/t | 5.21 Moz | 1.00 g/t | 20.83 Moz | 0.33% | 2.14 Mt Cu | 30 June 2026 | ||
| 3.63 g/t |
| 1,726.11 Moz |
| 30 June 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
| 0.31% |
| 45.97 Mt Cu |
| 30 June 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
notes (7)Ref: 6.1 Copper Mineral resources As at 30 June 2026
QA notes:
|
| Indicated | 3,540.00 Mt | 0.27 g/t | 30.73 Moz | 6.00 g/t | 682.88 Moz | 0.34% | 12.04 Mt Cu | 30 June 2026 | 6.1 Copper Mineral resources As at 30 June 2026Unverified | notes (6)Ref: 6.1 Copper Mineral resources As at 30 June 2026
QA notes:
|
| M&I = Measured + Indicated (overlaps both) | 4,180.00 Mt | 0.27 g/t | 36.29 Moz | 5.00 g/t | 671.95 Moz | 0.34% | 14.21 Mt Cu | 30 June 2026 | 6.1 Copper Mineral resources As at 30 June 2026Unverified | notes (6)Ref: 6.1 Copper Mineral resources As at 30 June 2026
QA notes:
|
| Inferred | 10,600.00 Mt | 0.18 g/t | 61.34 Moz | 3.00 g/t | 1,022.39 Moz | 0.30% | 31.80 Mt Cu | 30 June 2026 | 6.1 Copper Mineral resources As at 30 June 2026Unverified | notes (6)Ref: 6.1 Copper Mineral resources As at 30 June 2026
QA notes:
|
| Total Resources | 14,788.00 Mt | 0.20 g/t | 97.28 Moz | 3.63 g/t | 1,726.11 Moz | 0.31% | 45.97 Mt Cu | 30 June 2026 | derived from 3 rows | — |
Rows are hierarchical, not additive — do not sum a column across rows. “M&I” is the issuer's printed Measured + Indicated subtotal: it overlaps the Measured and Indicated rows and is never added alongside them. All derived totals and rollups on this site already exclude the overlapping rows.
Figures are on a 100% project basis unless a row carries the attrib chip; BHP Group Ltd holds 50.0% of this project.