Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | — | — | — | — |
| Total Resources | — | — | — | — |
| Proved | 20.00 Mt | 1.03 g/t | 0.66 Moz | 31 Dec 2025 |
| Probable | 27.00 Mt | 0.88 g/t | 0.76 Moz | 31 Dec 2025 |
| Total Reserves | 47.00 Mt | 0.94 g/t | 1.43 Moz | 31 Dec 2025 |
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | — | — | — | — |
| Total Resources | — | — | — | — |
| Proved | 20.00 Mt | 15.14 g/t | 9.74 Moz | 31 Dec 2025 |
| Probable | 27.00 Mt |
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | — | — | — | — |
| Total Resources | — | — | — | — |
| Proved | 20.00 Mt | 2.40% | 0.48 Mt Cu | 31 Dec 2025 |
| Probable | 27.00 Mt |
| Area | Category | Tonnes (Mt) | Au | Ag | Cu | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Cu) | Contained (Mt Cu) | ||||||
| Total | Total Reserves | 47.00 Mt | 0.94 g/t | 1.43 Moz | 13.70 g/t | 20.70 Moz | |||||
| 10.96 Moz |
| 31 Dec 2025 |
| Total Reserves | 47.00 Mt | 13.70 g/t | 20.70 Moz | 31 Dec 2025 |
| 0.57 Mt Cu |
| 31 Dec 2025 |
| Total Reserves | 47.00 Mt | 2.23% | 1.05 Mt Cu | 31 Dec 2025 |
| 1.05 Mt Cu |
| 31 Dec 2025 |
derived from 2 rows |
| — |
| Mill | Proved | 20.00 Mt | 1.03 g/t | 0.66 Moz | 15.14 g/t | 9.74 Moz | 2.40% | 0.48 Mt Cu | 31 Dec 2025 | Estimated Recoverable Proven and Probable Mineral Reserves at December 31, 2025Unverified | notes (3)Ref: Estimated Recoverable Proven and Probable Mineral Reserves at December 31, 2025
|
| Mill | Probable | 27.00 Mt | 0.88 g/t | 0.76 Moz | 12.63 g/t | 10.96 Moz | 2.10% | 0.57 Mt Cu | 31 Dec 2025 | Estimated Recoverable Proven and Probable Mineral Reserves at December 31, 2025Unverified | notes (3)Ref: Estimated Recoverable Proven and Probable Mineral Reserves at December 31, 2025
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Figures are on a 100% project basis unless a row carries the attrib chip; FREEPORT-MCMORAN INC holds 48.8% of this project.