Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | 68.00 Mt | 0.06 g/t | 0.13 Moz | 31 Dec 2025 |
| Indicated | 236.00 Mt | 0.06 g/t | 0.46 Moz | 31 Dec 2025 |
| Inferred | 42.00 Mt | 0.06 g/t | 0.08 Moz | 31 Dec 2025 |
| Total Resources | 346.00 Mt | 0.06 g/t | 0.67 Moz | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | 68.00 Mt | 1.55 g/t | 3.39 Moz | 31 Dec 2025 |
| Indicated | 236.00 Mt | 0.92 g/t | 6.98 Moz | 31 Dec 2025 |
| Inferred | 42.00 Mt | 0.94 g/t | 1.27 Moz | 31 Dec 2025 |
| Total Resources | 346.00 Mt | 1.05 g/t | 11.64 Moz | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable |
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | 68.00 Mt | 0.53% | 0.36 Mt Cu | 31 Dec 2025 |
| Indicated | 236.00 Mt | 0.37% | 0.87 Mt Cu | 31 Dec 2025 |
| Inferred | 42.00 Mt | 0.40% | 0.17 Mt Cu | 31 Dec 2025 |
| Total Resources | 346.00 Mt | 0.41% | 1.40 Mt Cu | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | Ag | Cu | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Cu) | Contained (Mt Cu) | ||||||
| Total | Total Resources | 346.00 Mt | 0.06 g/t | 0.67 Moz | 1.05 g/t | 11.64 Moz | |||||
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| 1.40 Mt Cu |
| 31 Dec 2025 |
derived from 3 rows |
| — |
| Milling | Measured | 68.00 Mt | 0.06 g/t | 0.13 Moz | 1.55 g/t | 3.39 Moz | 0.53% | 0.36 Mt Cu | 31 Dec 2025 | Estimated Mineral Resources at December 31, 2025Unverified | notes (4)Ref: Estimated Mineral Resources at December 31, 2025
|
| Milling | Indicated | 236.00 Mt | 0.06 g/t | 0.46 Moz | 0.92 g/t | 6.98 Moz | 0.37% | 0.87 Mt Cu | 31 Dec 2025 | Estimated Mineral Resources at December 31, 2025Unverified | notes (4)Ref: Estimated Mineral Resources at December 31, 2025
|
| Milling | Inferred | 42.00 Mt | 0.06 g/t | 0.08 Moz | 0.94 g/t | 1.27 Moz | 0.40% | 0.17 Mt Cu | 31 Dec 2025 | Estimated Mineral Resources at December 31, 2025Unverified | notes (4)Ref: Estimated Mineral Resources at December 31, 2025
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.