These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | — | — | — | — |
| Total Resources | — | — | — | — |
| Proved | 136.00 Mt | 0.94 g/t | 4.11 Moz | 31 Dec 2025 |
| Probable | 333.00 Mt | 0.86 g/t | 9.21 Moz | 31 Dec 2025 |
| Total Reserves | 469.00 Mt | 0.88 g/t | 13.32 Moz | 31 Dec 2025 |
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | — | — | — | — |
| Total Resources | — | — | — | — |
| Proved | 136.00 Mt | 5.62 g/t | 24.57 Moz | 31 Dec 2025 |
| Probable | 333.00 Mt |
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | — | — | — | — |
| Total Resources | — | — | — | — |
| Proved | 136.00 Mt | 1.07% | 1.46 Mt Cu | 31 Dec 2025 |
| Probable | 333.00 Mt |
| Area | Category | Tonnes (Mt) | Au | Ag | Cu | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Cu) | Contained (Mt Cu) | ||||||
| Total | Total Reserves | 469.00 Mt | 0.88 g/t | 13.32 Moz | 5.26 g/t | 79.28 Moz | |||||
| 54.71 Moz |
| 31 Dec 2025 |
| Total Reserves | 469.00 Mt | 5.26 g/t | 79.28 Moz | 31 Dec 2025 |
| 3.36 Mt Cu |
| 31 Dec 2025 |
| Total Reserves | 469.00 Mt | 1.03% | 4.82 Mt Cu | 31 Dec 2025 |
| 4.82 Mt Cu |
| 31 Dec 2025 |
derived from 2 rows |
| — |
| Mill | Proved | 136.00 Mt | 0.94 g/t | 4.11 Moz | 5.62 g/t | 24.57 Moz | 1.07% | 1.46 Mt Cu | 31 Dec 2025 | Estimated Recoverable Proven and Probable Mineral Reserves at December 31, 2025Unverified | notes (3)Ref: Estimated Recoverable Proven and Probable Mineral Reserves at December 31, 2025
|
| Mill | Probable | 333.00 Mt | 0.86 g/t | 9.21 Moz | 5.11 g/t | 54.71 Moz | 1.01% | 3.36 Mt Cu | 31 Dec 2025 | Estimated Recoverable Proven and Probable Mineral Reserves at December 31, 2025Unverified | notes (3)Ref: Estimated Recoverable Proven and Probable Mineral Reserves at December 31, 2025
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Figures are on a 100% project basis unless a row carries the attrib chip; FREEPORT-MCMORAN INC holds 48.8% of this project.