Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Zn) | Contained (Mt Zn) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 9.83 Mt | 3.78% | 0.37 Mt Zn | 31 Dec 2025 |
| Inferred | 3.38 Mt | 4.17% | 0.14 Mt Zn | 31 Dec 2025 |
| Total Resources | 13.21 Mt | 3.88% | 0.51 Mt Zn | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (% Pb) | Contained (Mt Pb) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 9.83 Mt | 0.51% | 0.05 Mt Pb | 31 Dec 2025 |
| Inferred | 3.38 Mt | 0.52% | 0.02 Mt Pb | 31 Dec 2025 |
| Total Resources | 13.21 Mt | 0.51% | 0.07 Mt Pb | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Zn | Pb | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|
| Grade (% Zn) | Contained (Mt Zn) | Grade (% Pb) | Contained (Mt Pb) | |||||
| Indicated | 9.83 Mt | 3.78% | 0.37 Mt Zn | 0.51% | 0.05 Mt Pb | 31 Dec 2025 | Mineral Resources (100% ownership basis) for other operating mines and zinc projects – December 31, 2025Unverified | |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
notes (5)Ref: Mineral Resources (100% ownership basis) for other operating mines and zinc projects – December 31, 2025
QA notes:
|
| Inferred | 3.38 Mt | 4.17% | 0.14 Mt Zn | 0.52% | 0.02 Mt Pb | 31 Dec 2025 | Mineral Resources (100% ownership basis) for other operating mines and zinc projects – December 31, 2025Unverified | notes (5)Ref: Mineral Resources (100% ownership basis) for other operating mines and zinc projects – December 31, 2025
QA notes:
|
| Total Resources | 13.21 Mt | 3.88% | 0.51 Mt Zn | 0.51% | 0.07 Mt Pb | 31 Dec 2025 | derived from 2 rows | — |