Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | 14.54 Mt | 30.90 g/t | 14.46 Moz | 31 Dec 2025 |
| Indicated | 34.03 Mt | 27.00 g/t | 29.53 Moz | 31 Dec 2025 |
| Inferred | 42.17 Mt | 25.00 g/t | 33.87 Moz | 31 Dec 2025 |
| Total Resources | 90.74 Mt | 26.70 g/t | 77.86 Moz | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (% Zn) | Contained (Mt Zn) | As at |
|---|---|---|---|---|
| Measured | 14.54 Mt | 3.39% | 0.49 Mt Zn | 31 Dec 2025 |
| Indicated | 34.03 Mt | 3.62% | 1.23 Mt Zn | 31 Dec 2025 |
| Inferred | 42.17 Mt | 4.06% | 1.71 Mt Zn | 31 Dec 2025 |
| Total Resources | 90.74 Mt | 3.79% | 3.44 Mt Zn | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable |
| Category | Tonnes (Mt) | Grade (% Pb) | Contained (Mt Pb) | As at |
|---|---|---|---|---|
| Measured | 14.54 Mt | 0.69% | 0.10 Mt Pb | 31 Dec 2025 |
| Indicated | 34.03 Mt | 0.54% | 0.18 Mt Pb | 31 Dec 2025 |
| Inferred | 42.17 Mt | 0.41% | 0.17 Mt Pb | 31 Dec 2025 |
| Total Resources | 90.74 Mt | 0.50% | 0.46 Mt Pb | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Ag | Zn | Pb | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Zn) | Contained (Mt Zn) | Grade (% Pb) | Contained (Mt Pb) | |||||
| Measured | 14.54 Mt | 30.90 g/t | 14.46 Moz | 3.39% | 0.49 Mt Zn | 0.69% | 0.10 Mt Pb | 31 Dec 2025 | ||
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
notes (5)Ref: Mineral Resources (100% ownership basis) for other operating mines and zinc projects – December 31, 2025
QA notes:
|
| Indicated | 34.03 Mt | 27.00 g/t | 29.53 Moz | 3.62% | 1.23 Mt Zn | 0.54% | 0.18 Mt Pb | 31 Dec 2025 | Mineral Resources (100% ownership basis) for other operating mines and zinc projects – December 31, 2025Unverified | notes (5)Ref: Mineral Resources (100% ownership basis) for other operating mines and zinc projects – December 31, 2025
QA notes:
|
| Inferred | 42.17 Mt | 25.00 g/t | 33.87 Moz | 4.06% | 1.71 Mt Zn | 0.41% | 0.17 Mt Pb | 31 Dec 2025 | Mineral Resources (100% ownership basis) for other operating mines and zinc projects – December 31, 2025Unverified | notes (5)Ref: Mineral Resources (100% ownership basis) for other operating mines and zinc projects – December 31, 2025
QA notes:
|
| Total Resources | 90.74 Mt | 26.70 g/t | 77.86 Moz | 3.79% | 3.44 Mt Zn | 0.50% | 0.46 Mt Pb | 31 Dec 2025 | derived from 3 rows
| — |
Figures are on a 100% project basis unless a row carries the attrib chip; Nexa Resources S.A. holds 83.5% of this project.