Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | 98.69 Mt | 2.80 g/t | 8.91 Moz | 31 Dec 2025 |
| Indicated | 90.68 Mt | 2.80 g/t | 8.04 Moz | 31 Dec 2025 |
| Inferred | 11.06 Mt | 3.10 g/t | 1.09 Moz | 31 Dec 2025 |
| Total Resources | 200.43 Mt | 2.82 g/t | 18.04 Moz | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | 98.69 Mt | 0.52% | 0.51 Mt Cu | 31 Dec 2025 |
| Indicated | 90.68 Mt | 0.43% | 0.39 Mt Cu | 31 Dec 2025 |
| Inferred | 11.06 Mt | 0.38% | 0.04 Mt Cu | 31 Dec 2025 |
| Total Resources | 200.43 Mt | 0.47% | 0.95 Mt Cu | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable |
| Category | Tonnes (Mt) | Grade (% Mo) | Contained (Mt Mo) | As at |
|---|---|---|---|---|
| Measured | 98.69 Mt | 0.05% | 0.05 Mt Mo | 31 Dec 2025 |
| Indicated | 90.68 Mt | 0.04% | 0.04 Mt Mo | 31 Dec 2025 |
| Inferred | 11.06 Mt | 0.05% | 0.01 Mt Mo | 31 Dec 2025 |
| Total Resources | 200.43 Mt | 0.05% | 0.09 Mt Mo | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Ag | Cu | Mo | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Cu) | Contained (Mt Cu) | Grade (% Mo) | Contained (Mt Mo) | |||||
| Measured | 98.69 Mt | 2.80 g/t | 8.91 Moz | 0.52% | 0.51 Mt Cu | 0.05% | 0.05 Mt Mo | 31 Dec 2025 | ||
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
notes (5)Ref: Mineral Resources (100% ownership basis) for copper project – December 31, 2025
QA notes:
|
| Indicated | 90.68 Mt | 2.80 g/t | 8.04 Moz | 0.43% | 0.39 Mt Cu | 0.04% | 0.04 Mt Mo | 31 Dec 2025 | Mineral Resources (100% ownership basis) for copper project – December 31, 2025Unverified | notes (5)Ref: Mineral Resources (100% ownership basis) for copper project – December 31, 2025
QA notes:
|
| Inferred | 11.06 Mt | 3.10 g/t | 1.09 Moz | 0.38% | 0.04 Mt Cu | 0.05% | 0.01 Mt Mo | 31 Dec 2025 | Mineral Resources (100% ownership basis) for copper project – December 31, 2025Unverified | notes (5)Ref: Mineral Resources (100% ownership basis) for copper project – December 31, 2025
QA notes:
|
| Total Resources | 200.43 Mt | 2.82 g/t | 18.04 Moz | 0.47% | 0.95 Mt Cu | 0.05% | 0.09 Mt Mo | 31 Dec 2025 | derived from 3 rows | — |
Figures are on a 100% project basis unless a row carries the attrib chip; Nexa Resources S.A. holds 83.5% of this project.