These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | 0.01 Mt | 1.95 g/t | 0.44 koz | 31 Mar 2025 |
| Indicated | 50.08 Mt | 2.45 g/t | 3.95 Moz | 31 Mar 2025 |
| M&I = Measured + Indicated (overlaps both) | 90.22 Mt | 1.71 g/t | 4.95 Moz | 31 Dec 2025 |
| Inferred | 5.58 Mt | 2.21 g/t | 0.40 Moz | 31 Mar 2025 |
| Total Resources | 57.59 Mt | 2.44 g/t | 4.52 Moz | 31 Mar 2025 |
| Proved | 2.92 Mt | 0.73 g/t | 0.07 Moz | 31 Dec 2025 |
| Probable | 28.79 Mt | 0.75 g/t | 0.69 Moz | 31 Dec 2025 |
| Total Reserves | 31.71 Mt | 0.74 g/t | 0.76 Moz | 31 Dec 2025 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | 0.01 Mt | 31.50 g/t | 0.01 Moz | 31 Mar 2025 |
| Indicated | 50.08 Mt | 10.60 g/t | 17.05 Moz | 31 Mar 2025 |
| M&I = Measured + Indicated (overlaps both) | 90.22 Mt | 12.32 g/t | 35.71 Moz | 31 Dec 2025 |
| Inferred | 5.58 Mt | 10.90 g/t | 1.95 Moz | 31 Mar 2025 |
| Total Resources |
| Category | Tonnes (Mt) | Grade (% Zn) | Contained (Mt Zn) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 35.90 Mt | 0.35% | 0.13 Mt Zn | 31 Mar 2025 |
| M&I = Measured + Indicated (overlaps both) | 48.18 Mt | 0.38% | 0.18 Mt Zn | 30 Sept 2025 |
| Inferred | 2.81 Mt | 0.42% | 0.01 Mt Zn | 31 Mar 2025 |
| Total Resources | 38.71 Mt |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | Ag | Zn | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Zn) | Contained (Mt Zn) | ||||||
| Total | Measured | 0.01 Mt | 1.95 g/t | 0.44 koz | 31.50 g/t | 0.01 Moz | — | — | |||
| 5.48 g/t |
| 4.56 Moz |
| 31 Mar 2025 |
| Proved | 2.92 Mt | 18.10 g/t | 1.70 Moz | 31 Dec 2025 |
| Probable | 28.79 Mt | 14.70 g/t | 13.58 Moz | 31 Dec 2025 |
| Total Reserves | 31.71 Mt | 15.00 g/t | 15.28 Moz | 31 Dec 2025 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
| 0.14 Mt Zn |
| 31 Mar 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
| 31 Mar 2025 |
| Table 1: Camino Rojo Underground Mineral Resource Estimate – Total - Gold rowUnverified |
notes (5)Source: Orla Mining Delivers Initial Underground Mineral Resource for Camino Rojo in Mexico, Paving the Way for Future Development Planning · published 05 June 2025 Ref: Table 1: Camino Rojo Underground Mineral Resource Estimate – Total - Gold row
QA notes:
|
| Total | Indicated | 35.90–50.08 Mt | 2.45 g/t | 3.95 Moz | 10.60 g/t | 17.05 Moz | 0.35% | 0.13 Mt Zn | 31 Mar 2025 | Table 1: Camino Rojo Underground Mineral Resource Estimate – Total - Gold rowUnverified | notes (5)Source: Orla Mining Delivers Initial Underground Mineral Resource for Camino Rojo in Mexico, Paving the Way for Future Development Planning · published 05 June 2025 Ref: Table 1: Camino Rojo Underground Mineral Resource Estimate – Total - Gold row
QA notes:
|
| Total | Inferred | 2.81–5.58 Mt | 2.21 g/t | 0.40 Moz | 10.90 g/t | 1.95 Moz | 0.42% | 0.01 Mt Zn | 31 Mar 2025 | Table 1: Camino Rojo Underground Mineral Resource Estimate – Total - Silver rowUnverified | notes (5)Source: Orla Mining Delivers Initial Underground Mineral Resource for Camino Rojo in Mexico, Paving the Way for Future Development Planning · published 05 June 2025 Ref: Table 1: Camino Rojo Underground Mineral Resource Estimate – Total - Silver row
QA notes:
|
| Total | Total Resources | 25.87–57.59 Mt | 2.44 g/t | 4.52 Moz | 5.48 g/t | 4.56 Moz | 0.36% | 0.14 Mt Zn | 31 Mar 2025 | derived from 6 rows
| — |
| CIL | Indicated | 12.48 Mt | 2.07 g/t | 0.83 Moz | 8.70 g/t | 3.48 Moz | — | — | 31 Mar 2025 | Table 1: Camino Rojo Underground Mineral Resource EstimateUnverified | notes (3)Source: Orla Mining Delivers Initial Underground Mineral Resource for Camino Rojo in Mexico, Paving the Way for Future Development Planning · published 05 June 2025 Ref: Table 1: Camino Rojo Underground Mineral Resource Estimate
|
| CIL | Inferred | 2.55 Mt | 1.81 g/t | 0.15 Moz | 10.20 g/t | 0.84 Moz | — | — | 31 Mar 2025 | Table 1: Camino Rojo Underground Mineral Resource EstimateUnverified | notes (3)Source: Orla Mining Delivers Initial Underground Mineral Resource for Camino Rojo in Mexico, Paving the Way for Future Development Planning · published 05 June 2025 Ref: Table 1: Camino Rojo Underground Mineral Resource Estimate
|
| FLOT/POX/CIL | Indicated | 35.90 Mt | 2.56 g/t | 2.96 Moz | 11.10 g/t | 12.85 Moz | 0.35% | 0.13 Mt Zn | 31 Mar 2025 | Table 1: Camino Rojo Underground Mineral Resource EstimateUnverified | notes (3)Source: Orla Mining Delivers Initial Underground Mineral Resource for Camino Rojo in Mexico, Paving the Way for Future Development Planning · published 05 June 2025 Ref: Table 1: Camino Rojo Underground Mineral Resource Estimate
|
| FLOT/POX/CIL | Inferred | 2.81 Mt | 2.57 g/t | 0.23 Moz | 11.20 g/t | 1.01 Moz | 0.42% | 0.01 Mt Zn | 31 Mar 2025 | Table 1: Camino Rojo Underground Mineral Resource EstimateUnverified | notes (3)Source: Orla Mining Delivers Initial Underground Mineral Resource for Camino Rojo in Mexico, Paving the Way for Future Development Planning · published 05 June 2025 Ref: Table 1: Camino Rojo Underground Mineral Resource Estimate
|
| Heap leach | Measured | 0.01 Mt | 1.95 g/t | 0.44 koz | 31.50 g/t | 0.01 Moz | — | — | 31 Mar 2025 | Table 1: Camino Rojo Underground Mineral Resource EstimateUnverified | notes (4)Source: Orla Mining Delivers Initial Underground Mineral Resource for Camino Rojo in Mexico, Paving the Way for Future Development Planning · published 05 June 2025 Ref: Table 1: Camino Rojo Underground Mineral Resource Estimate
QA notes:
|
| Heap leach | Indicated | 1.70 Mt | 2.90 g/t | 0.16 Moz | 13.20 g/t | 0.72 Moz | — | — | 31 Mar 2025 | Table 1: Camino Rojo Underground Mineral Resource EstimateUnverified | notes (3)Source: Orla Mining Delivers Initial Underground Mineral Resource for Camino Rojo in Mexico, Paving the Way for Future Development Planning · published 05 June 2025 Ref: Table 1: Camino Rojo Underground Mineral Resource Estimate
|
| Heap leach | Inferred | 0.21 Mt | 2.29 g/t | 0.02 Moz | 15.10 g/t | 0.10 Moz | — | — | 31 Mar 2025 | Table 1: Camino Rojo Underground Mineral Resource EstimateUnverified | notes (3)Source: Orla Mining Delivers Initial Underground Mineral Resource for Camino Rojo in Mexico, Paving the Way for Future Development Planning · published 05 June 2025 Ref: Table 1: Camino Rojo Underground Mineral Resource Estimate
|
| Oxide | Measured | 3.26 Mt | 0.73 g/t | 0.08 Moz | 17.20 g/t | 1.80 Moz | — | — | 31 Dec 2025 | 17Unverified | notes (4)Source: Orla Mining Annual Information Form FY2025 (R&R eff. 31 Dec 2025 incl. Musselwhite) · published 19 Mar 2026 Ref: 17
|
| Oxide | Indicated | 38.78 Mt | 0.85 g/t | 1.07 Moz | 13.30 g/t | 16.60 Moz | — | — | 31 Dec 2025 | 17Unverified | notes (4)Source: Orla Mining Annual Information Form FY2025 (R&R eff. 31 Dec 2025 incl. Musselwhite) · published 19 Mar 2026 Ref: 17
|
| Oxide | M&I = Measured + Indicated (overlaps both) | 42.04 Mt | 0.84 g/t | 1.14 Moz | 13.60 g/t | 18.40 Moz | — | — | 31 Dec 2025 | 17Unverified | notes (7)Source: Orla Mining Annual Information Form FY2025 (R&R eff. 31 Dec 2025 incl. Musselwhite) · published 19 Mar 2026 Ref: 17
QA notes:
|
| Oxide | Inferred | 1.64 Mt | 0.95 g/t | 0.05 Moz | 13.00 g/t | 0.68 Moz | — | — | 31 Dec 2025 | 17Unverified | notes (4)Source: Orla Mining Annual Information Form FY2025 (R&R eff. 31 Dec 2025 incl. Musselwhite) · published 19 Mar 2026 Ref: 17
QA notes:
|
| Sulphide | Indicated | 48.18 Mt | 2.46 g/t | 3.81 Moz | 11.20 g/t | 17.31 Moz | 0.38% | 0.18 Mt Zn | 30 Sept 2025 | 17Unverified | notes (4)Source: Orla Mining Annual Information Form FY2025 (R&R eff. 31 Dec 2025 incl. Musselwhite) · published 19 Mar 2026 Ref: 17
|
| Sulphide | M&I = Measured + Indicated (overlaps both) | 48.18 Mt | 2.46 g/t | 3.81 Moz | 11.20 g/t | 17.31 Moz | 0.38% | 0.18 Mt Zn | 30 Sept 2025 | 17Unverified | notes (7)Source: Orla Mining Annual Information Form FY2025 (R&R eff. 31 Dec 2025 incl. Musselwhite) · published 19 Mar 2026 Ref: 17
QA notes:
|
| Sulphide | Inferred | 4.05 Mt | 2.48 g/t | 0.32 Moz | 10.90 g/t | 1.42 Moz | 0.65% | 0.03 Mt Zn | 30 Sept 2025 | 18Unverified | notes (4)Source: Orla Mining Annual Information Form FY2025 (R&R eff. 31 Dec 2025 incl. Musselwhite) · published 19 Mar 2026 Ref: 18
QA notes:
|
| Area | Category | Tonnes (Mt) | Au | Ag | Zn | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Zn) | Contained (Mt Zn) | ||||||
| Oxide | Proved | 2.92 Mt | 0.73 g/t | 0.07 Moz | 18.10 g/t | 1.70 Moz | — | — | 31 Dec 2025 | 15Unverified | notes (4)Source: Orla Mining Annual Information Form FY2025 (R&R eff. 31 Dec 2025 incl. Musselwhite) · published 19 Mar 2026 Ref: 15
QA notes:
|
| Oxide | Probable | 28.79 Mt | 0.75 g/t | 0.69 Moz | 14.70 g/t | 13.58 Moz | — | — | 31 Dec 2025 | 15Unverified | |
| Oxide | Total Reserves | 31.71 Mt | 0.74 g/t | 0.76 Moz | 15.00 g/t | 15.28 Moz | — | — | 31 Dec 2025 | 15Unverified | |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. “M&I” is the issuer's printed Measured + Indicated subtotal: it overlaps the Measured and Indicated rows and is never added alongside them. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.