Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 325.00 Mt | 0.32 g/t | 3.34 Moz | 31 Dec 2025 |
| Inferred | 194.00 Mt | 0.36 g/t | 2.25 Moz | 31 Dec 2025 |
| Total Resources | 519.00 Mt | 0.33 g/t | 5.59 Moz | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 325.00 Mt | 2.24 g/t | 23.41 Moz | 31 Dec 2025 |
| Inferred | 194.00 Mt | 2.12 g/t | 13.22 Moz | 31 Dec 2025 |
| Total Resources | 519.00 Mt | 2.20 g/t | 36.63 Moz | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable |
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 325.00 Mt | 0.39% | 1.27 Mt Cu | 31 Dec 2025 |
| Inferred | 194.00 Mt | 0.41% | 0.80 Mt Cu | 31 Dec 2025 |
| Total Resources | 519.00 Mt | 0.40% | 2.06 Mt Cu | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Au | Ag | Cu | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Cu) | Contained (Mt Cu) | |||||
| Indicated | 325.00 Mt | 0.32 g/t | 3.34 Moz | 2.24 g/t | 23.41 Moz | 0.39% | 1.27 Mt Cu | 31 Dec 2025 | ||
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
notes (3)Ref: Mineral Resources — Copper table
QA notes:
|
| Inferred | 194.00 Mt | 0.36 g/t | 2.25 Moz | 2.12 g/t | 13.22 Moz | 0.41% | 0.80 Mt Cu | 31 Dec 2025 | Mineral Resources — Copper tableUnverified | notes (3)Ref: Mineral Resources — Copper table
QA notes:
|
| Total Resources | 519.00 Mt | 0.33 g/t | 5.59 Moz | 2.20 g/t | 36.63 Moz | 0.40% | 2.06 Mt Cu | 31 Dec 2025 | derived from 2 rows
| — |
Figures are on a 100% project basis unless a row carries the attrib chip; RIO TINTO PLC holds 70.0% of this project.