Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 150.00 Mt | 0.50% | 0.75 Mt Cu | 31 Dec 2025 |
| Inferred | 1,433.00 Mt | 0.45% | 6.43 Mt Cu | 31 Dec 2025 |
| Total Resources | 1,583.00 Mt | 0.45% | 7.17 Mt Cu | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Cu | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (% Cu) | Contained (Mt Cu) | |||||
| Indicated | 150.00 Mt | 0.50% | 0.75 Mt Cu | 31 Dec 2025 | Los Chancas — Mineral resources tableUnverified | |
notes (3)Ref: Los Chancas — Mineral resources table
|
| Inferred | 1,433.00 Mt | 0.45% | 6.43 Mt Cu | 31 Dec 2025 | Los Chancas — Mineral resources tableUnverified | notes (3)Ref: Los Chancas — Mineral resources table
|
| Total Resources | 1,583.00 Mt | 0.45% | 7.17 Mt Cu | 31 Dec 2025 | derived from 2 rows
| — |