These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | 2.60 Mt | 1.96 g/t | 0.16 Moz | 31 Dec 2025 |
| Indicated | 227.64 Mt | 2.42 g/t | 17.89 Moz | 31 Dec 2025 |
| Inferred | 76.42 Mt | 2.40 g/t | 5.85 Moz | 31 Dec 2025 |
| Total Resources | 160.33 Mt | 2.14 g/t | 11.06 Moz | 31 Dec 2025 |
| Proved | 2.60 Mt | 1.96 g/t | 0.16 Moz | 31 Dec 2025 |
| Probable | 143.09 Mt | 2.75 g/t | 12.68 Moz | 31 Dec 2025 |
| Total Reserves | 146.34 Mt | 2.75 g/t | 12.85 Moz | 31 Dec 2025 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Measured | 2.60 Mt | 1.96 g/t | 0.16 Moz | 31 Dec 2025 | Gold Mineral Resources table — Cortez (61.50%) totalUnverified | |
notes (5)Ref: Gold Mineral Resources table — Cortez (61.50%) total
QA notes:
|
| Total | Indicated | 227.64 Mt | 2.42 g/t | 17.89 Moz | 31 Dec 2025 | Gold Mineral Resources table — Cortez (61.50%) totalUnverified | notes (4)Ref: Gold Mineral Resources table — Cortez (61.50%) total
|
| Total | Inferred | 76.42 Mt | 2.40 g/t | 5.85 Moz | 31 Dec 2025 | Gold Mineral Resources table — Cortez (61.50%) totalUnverified | notes (5)Ref: Gold Mineral Resources table — Cortez (61.50%) total
QA notes:
|
| Total | Total Resources | 160.33 Mt | 2.14 g/t | 11.06 Moz | 31 Dec 2025 | derived from 3 rows | — |
| surface | Measured | 2.60 Mt | 1.96 g/t | 0.16 Moz | 31 Dec 2025 | Gold Mineral Resources tableUnverified | notes (5)Ref: Gold Mineral Resources table
QA notes:
|
| surface | Indicated | 157.72 Mt | 0.89 g/t | 4.55 Moz | 31 Dec 2025 | Gold Mineral Resources tableUnverified | notes (4)Ref: Gold Mineral Resources table
|
| surface | Inferred | 50.41 Mt | 0.60 g/t | 0.98 Moz | 31 Dec 2025 | Gold Mineral Resources tableUnverified | notes (4)Ref: Gold Mineral Resources table
|
| underground | Indicated | 63.41 Mt | 6.23 g/t | 12.68 Moz | 31 Dec 2025 | Gold Mineral Resources tableUnverified | notes (4)Ref: Gold Mineral Resources table
|
| underground | Inferred | 26.02 Mt | 5.70 g/t | 4.88 Moz | 31 Dec 2025 | Gold Mineral Resources tableUnverified | notes (5)Ref: Gold Mineral Resources table
QA notes:
|
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Total Reserves | 146.34 Mt | 2.75 g/t | 12.85 Moz | 31 Dec 2025 | Gold Mineral Reserves table — Cortez (61.50%) totalUnverified | notes (4)Ref: Gold Mineral Reserves table — Cortez (61.50%) total
QA notes:
|
| surface | Proved | 2.60 Mt | 1.96 g/t | 0.16 Moz | 31 Dec 2025 | Gold Mineral Reserves tableUnverified | notes (4)Ref: Gold Mineral Reserves table |
| surface | Probable | 97.56 Mt | 0.92 g/t | 2.93 Moz | 31 Dec 2025 | Gold Mineral Reserves tableUnverified | notes (4) |
| underground | Probable | 45.53 Mt | 6.67 g/t | 9.76 Moz | 31 Dec 2025 | Gold Mineral Reserves tableUnverified | notes (4)Ref: Gold Mineral Reserves table |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.
Figures are on a 100% project basis unless a row carries the attrib chip; Barrick Mining Corporation holds 61.5% of this project.