Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | 14.63 Mt | 10.99 g/t | 5.20 Moz | 31 Dec 2025 |
| Indicated | 102.44 Mt | 4.30 g/t | 14.15 Moz | 31 Dec 2025 |
| Inferred | 30.89 Mt | 3.20 g/t | 3.25 Moz | 31 Dec 2025 |
| Total Resources | 73.17 Mt | 3.46 g/t | 8.13 Moz | 31 Dec 2025 |
| Proved | 10.73 Mt | 11.67 g/t | 4.07 Moz | 31 Dec 2025 |
| Probable | 63.41 Mt | 5.03 g/t | 10.41 Moz | 31 Dec 2025 |
| Total Reserves | 74.80 Mt | 6.07 g/t | 14.47 Moz | 31 Dec 2025 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Measured | 14.63 Mt | 10.99 g/t | 5.20 Moz | 31 Dec 2025 | Gold Mineral Resources table — Turquoise Ridge (61.50%) totalUnverified | |
notes (5)Ref: Gold Mineral Resources table — Turquoise Ridge (61.50%) total
QA notes:
|
| Total | Indicated | 102.44 Mt | 4.30 g/t | 14.15 Moz | 31 Dec 2025 | Gold Mineral Resources table — Turquoise Ridge (61.50%) totalUnverified | notes (5)Ref: Gold Mineral Resources table — Turquoise Ridge (61.50%) total
QA notes:
|
| Total | Inferred | 30.89 Mt | 3.20 g/t | 3.25 Moz | 31 Dec 2025 | Gold Mineral Resources table — Turquoise Ridge (61.50%) totalUnverified | notes (5)Ref: Gold Mineral Resources table — Turquoise Ridge (61.50%) total
QA notes:
|
| Total | Total Resources | 73.17 Mt | 3.46 g/t | 8.13 Moz | 31 Dec 2025 | derived from 3 rows | — |
| surface | Indicated | 69.92 Mt | 1.88 g/t | 4.23 Moz | 31 Dec 2025 | Gold Mineral Resources tableUnverified | notes (4)Ref: Gold Mineral Resources table
|
| surface | Inferred | 22.76 Mt | 1.10 g/t | 0.81 Moz | 31 Dec 2025 | Gold Mineral Resources tableUnverified | notes (4)Ref: Gold Mineral Resources table
|
| underground | Indicated | 32.52 Mt | 9.59 g/t | 9.92 Moz | 31 Dec 2025 | Gold Mineral Resources tableUnverified | notes (5)Ref: Gold Mineral Resources table
QA notes:
|
| underground | Inferred | 7.80 Mt | 9.50 g/t | 2.44 Moz | 31 Dec 2025 | Gold Mineral Resources tableUnverified | notes (5)Ref: Gold Mineral Resources table
QA notes:
|
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Total Reserves | 74.80 Mt | 6.07 g/t | 14.47 Moz | 31 Dec 2025 | Gold Mineral Reserves table — Turquoise Ridge (61.50%) totalUnverified | notes (4)Ref: Gold Mineral Reserves table — Turquoise Ridge (61.50%) total
QA notes:
|
| surface | Probable | 40.65 Mt | 2.20 g/t | 2.76 Moz | 31 Dec 2025 | Gold Mineral Reserves tableUnverified | notes (4)Ref: Gold Mineral Reserves table |
| underground | Proved | 10.73 Mt | 11.67 g/t | 4.07 Moz | 31 Dec 2025 | Gold Mineral Reserves tableUnverified | notes (4)Ref: Gold Mineral Reserves table |
| underground | Probable | 22.76 Mt | 10.09 g/t | 7.64 Moz | 31 Dec 2025 | Gold Mineral Reserves tableUnverified | notes (4) |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.
Figures are on a 100% project basis unless a row carries the attrib chip; Barrick Mining Corporation holds 61.5% of this project.