Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 78.50 Mt | 1.30 g/t | 3.40 Moz | 27 Feb 2026 |
| Inferred | 25.90 Mt | 2.70 g/t | 2.20 Moz | 27 Feb 2026 |
| Total Resources | 104.40 Mt | 1.65 g/t | 5.60 Moz | 27 Feb 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Indicated | 78.50 Mt | 1.30 g/t | 3.40 Moz | 27 Feb 2026 | Table 3. 2026 Mineral Resource Estimate — TotalUnverified | |
notes (5)Source: Cadillac Mines Announces Significant High Grade Infill Drill Results at Kerr-Addison Open Pit, Including 2.13 Grams Per Tonne Gold Over 38.2 Metres Within the 2026 Mineral Resource Pit · published 19 Aug 2026 Ref: Table 3. 2026 Mineral Resource Estimate — Total
QA notes:
|
| Total | Inferred | 25.90 Mt | 2.70 g/t | 2.20 Moz | 27 Feb 2026 | Table 3. 2026 Mineral Resource Estimate — TotalUnverified | notes (5)Source: Cadillac Mines Announces Significant High Grade Infill Drill Results at Kerr-Addison Open Pit, Including 2.13 Grams Per Tonne Gold Over 38.2 Metres Within the 2026 Mineral Resource Pit · published 19 Aug 2026 Ref: Table 3. 2026 Mineral Resource Estimate — Total
QA notes:
|
| Total | Total Resources | 104.40 Mt | 1.65 g/t | 5.60 Moz | 27 Feb 2026 | derived from 2 rows | — |
| Open Pit | Indicated | 74.30 Mt | 1.30 g/t | 3.00 Moz | 27 Feb 2026 | Table 3. 2026 Mineral Resource EstimateUnverified | notes (6)Source: Cadillac Mines Announces Significant High Grade Infill Drill Results at Kerr-Addison Open Pit, Including 2.13 Grams Per Tonne Gold Over 38.2 Metres Within the 2026 Mineral Resource Pit · published 19 Aug 2026 Ref: Table 3. 2026 Mineral Resource Estimate
QA notes:
|
| Open Pit | Inferred | 13.60 Mt | 0.60 g/t | 0.30 Moz | 27 Feb 2026 | Table 3. 2026 Mineral Resource EstimateUnverified | notes (6)Source: Cadillac Mines Announces Significant High Grade Infill Drill Results at Kerr-Addison Open Pit, Including 2.13 Grams Per Tonne Gold Over 38.2 Metres Within the 2026 Mineral Resource Pit · published 19 Aug 2026 Ref: Table 3. 2026 Mineral Resource Estimate
QA notes:
|
| Underground | Indicated | 4.10 Mt | 2.60 g/t | 0.40 Moz | 27 Feb 2026 | Table 3. 2026 Mineral Resource EstimateUnverified | notes (6)Source: Cadillac Mines Announces Significant High Grade Infill Drill Results at Kerr-Addison Open Pit, Including 2.13 Grams Per Tonne Gold Over 38.2 Metres Within the 2026 Mineral Resource Pit · published 19 Aug 2026 Ref: Table 3. 2026 Mineral Resource Estimate
QA notes:
|
| Underground | Inferred | 12.30 Mt | 4.90 g/t | 1.90 Moz | 27 Feb 2026 | Table 3. 2026 Mineral Resource EstimateUnverified | notes (6)Source: Cadillac Mines Announces Significant High Grade Infill Drill Results at Kerr-Addison Open Pit, Including 2.13 Grams Per Tonne Gold Over 38.2 Metres Within the 2026 Mineral Resource Pit · published 19 Aug 2026 Ref: Table 3. 2026 Mineral Resource Estimate
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.