Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 222.30 Mt | 1.49 g/t | 11.00 Moz | 13 Jan 2025 |
| Total Resources | 222.30 Mt | 1.49 g/t | 11.00 Moz | 13 Jan 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | |||||
| Inferred | 222.30 Mt | 1.49 g/t | 11.00 Moz | 13 Jan 2025 | Dome Mine Project section — prose description of current mineral resourceUnverified | |
notes (4)Source: Discovery Reports Positive Drill Results at Key Growth Projects, Resource Estimates for Dome and TVZ on Track for Late 2026 · published 05 Aug 2026 Ref: Dome Mine Project section — prose description of current mineral resource
QA notes:
|
| Total Resources | 222.30 Mt | 1.49 g/t | 11.00 Moz | 13 Jan 2025 | derived from 1 row | — |