Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | 357.60 Mt | 0.12 g/t | 1.38 Moz | 31 Dec 2025 |
| Indicated | 902.40 Mt | 0.11 g/t | 3.19 Moz | 31 Dec 2025 |
| M&I = Measured + Indicated (overlaps both) | 1,260.00 Mt | 0.11 g/t | 4.46 Moz | 31 Dec 2025 |
| Inferred | 49.30 Mt | 0.09 g/t | 0.14 Moz | 31 Dec 2025 |
| Total Resources | 456.50 Mt | 0.12 g/t | 1.74 Moz | 31 Dec 2025 |
| Proved | 365.60 Mt | 0.11 g/t | 1.29 Moz | 31 Dec 2025 |
| Probable | 658.70 Mt | 0.10 g/t | 2.12 Moz | 31 Dec 2025 |
| Total Reserves | 1,024.30 Mt | 0.10 g/t | 3.29 Moz | 31 Dec 2025 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | 357.60 Mt | 0.66% | 2.36 Mt Cu | 31 Dec 2025 |
| Indicated | 902.40 Mt | 0.53% | 4.78 Mt Cu | 31 Dec 2025 |
| M&I = Measured + Indicated (overlaps both) | 1,260.00 Mt | 0.57% | 7.18 Mt Cu | 31 Dec 2025 |
| Inferred | 49.30 Mt | 0.41% | 0.20 Mt Cu | 31 Dec 2025 |
| Total Resources |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | Cu | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (% Cu) | Contained (Mt Cu) | ||||||
| Total | Measured | 357.60 Mt | 0.12 g/t | 1.38 Moz | 0.66% | 2.36 Mt Cu | 31 Dec 2025 | First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.) | |
| 0.60% |
| 2.72 Mt Cu |
| 31 Dec 2025 |
| Proved | 365.60 Mt | 0.59% | 2.16 Mt Cu | 31 Dec 2025 |
| Probable | 658.70 Mt | 0.47% | 3.10 Mt Cu | 31 Dec 2025 |
| Total Reserves | 1,024.30 Mt | 0.51% | 5.22 Mt Cu | 31 Dec 2025 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
notes (3)Source: First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.) · published 28 Feb 2026
QA notes:
|
| Total | Indicated | 902.40 Mt | 0.11 g/t | 3.19 Moz | 0.53% | 4.78 Mt Cu | 31 Dec 2025 | First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.)Manual entry | notes (3)Source: First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.) · published 28 Feb 2026
QA notes:
|
| Total | M&I = Measured + Indicated (overlaps both) | 1,260.00 Mt | 0.11 g/t | 4.46 Moz | 0.57% | 7.18 Mt Cu | 31 Dec 2025 | First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.)Manual entry | notes (3)Source: First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.) · published 28 Feb 2026
QA notes:
|
| Total | Inferred | 49.30 Mt | 0.09 g/t | 0.14 Moz | 0.41% | 0.20 Mt Cu | 31 Dec 2025 | First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.)Manual entry | notes (2)Source: First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.) · published 28 Feb 2026
QA notes:
|
| Total | Total Resources | 456.50 Mt | 0.12 g/t | 1.74 Moz | 0.60% | 2.72 Mt Cu | 31 Dec 2025 | derived from 6 rows
| — |
| Combined Main, NW and SE Dome deposits | Measured | 357.60 Mt | 0.12 g/t | 1.38 Moz | 0.66% | 2.36 Mt Cu | 31 Dec 2025 | 107Unverified | notes (4)Source: First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.) · published 28 Feb 2026 Ref: 107
QA notes:
|
| Combined Main, NW and SE Dome deposits | Indicated | 730.90 Mt | 0.12 g/t | 2.82 Moz | 0.57% | 4.17 Mt Cu | 31 Dec 2025 | 107Unverified | notes (4)Source: First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.) · published 28 Feb 2026 Ref: 107
QA notes:
|
| Combined Main, NW and SE Dome deposits | M&I = Measured + Indicated (overlaps both) | 1,088.50 Mt | 0.12 g/t | 4.20 Moz | 0.60% | 6.53 Mt Cu | 31 Dec 2025 | 107Unverified | notes (6)Source: First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.) · published 28 Feb 2026 Ref: 107
QA notes:
|
| Combined Main, NW and SE Dome deposits | Inferred | 49.30 Mt | 0.09 g/t | 0.14 Moz | 0.41% | 0.20 Mt Cu | 31 Dec 2025 | 107Unverified | notes (3)Source: First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.) · published 28 Feb 2026 Ref: 107
QA notes:
|
| Stockpiles - Leach | Indicated | 74.00 Mt | 0.05 g/t | 0.12 Moz | 0.28% | 0.21 Mt Cu | 31 Dec 2025 | 107Unverified | notes (3)Source: First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.) · published 28 Feb 2026 Ref: 107
QA notes:
|
| Stockpiles - Mixed | Indicated | 36.20 Mt | 0.07 g/t | 0.08 Moz | 0.52% | 0.19 Mt Cu | 31 Dec 2025 | 107Unverified | notes (3)Source: First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.) · published 28 Feb 2026 Ref: 107
QA notes:
|
| Stockpiles - Sulphide | Indicated | 61.30 Mt | 0.06 g/t | 0.12 Moz | 0.33% | 0.20 Mt Cu | 31 Dec 2025 | 107Unverified | notes (3)Source: First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.) · published 28 Feb 2026 Ref: 107
QA notes:
|
| Area | Category | Tonnes (Mt) | Au | Cu | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (% Cu) | Contained (Mt Cu) | ||||||
| Total | Proved | 365.60 Mt | 0.11 g/t | 1.29 Moz | 0.59% | 2.16 Mt Cu | 31 Dec 2025 | First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.)Manual entry | notes (2)Source: First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.) · published 28 Feb 2026
QA notes:
|
| Total | Probable | 658.70 Mt | 0.10 g/t | 2.12 Moz | 0.47% | 3.10 Mt Cu | 31 Dec 2025 | First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.)Manual entry | notes (2)Source: |
| Total | Total Reserves | 1,024.30 Mt | 0.10 g/t | 3.29 Moz | 0.51% | 5.22 Mt Cu | 31 Dec 2025 | First Quantum Minerals Annual Information Form 2026 (R&R as at 31 Dec 2025: Kansanshi, Sentinel, Cobre Panama et al.)Manual entry | notes (2) |
| Main and North West Pits | Proved | 273.20 Mt | 0.11 g/t | 0.97 Moz | 0.58% | 1.58 Mt Cu | 31 Dec 2025 | 107Unverified | notes (4) |
| Main and North West Pits | Probable | 381.60 Mt | 0.12 g/t | 1.47 Moz | 0.52% | 1.98 Mt Cu | 31 Dec 2025 | 107Unverified | notes (4) |
| South East Dome Pits | Proved | 92.40 Mt | 0.12 g/t | 0.36 Moz | 0.61% | 0.56 Mt Cu | 31 Dec 2025 | 107Unverified | notes (4) |
| South East Dome Pits | Probable | 105.60 Mt | 0.09 g/t | 0.31 Moz | 0.50% | 0.53 Mt Cu | 31 Dec 2025 | 107Unverified | notes (4) |
| Stockpiles | Probable | 171.50 Mt | 0.06 g/t | 0.33 Moz | 0.35% | 0.60 Mt Cu | 31 Dec 2025 | 108Unverified | notes (4) |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. “M&I” is the issuer's printed Measured + Indicated subtotal: it overlaps the Measured and Indicated rows and is never added alongside them. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.
Figures are on a 100% project basis unless a row carries the attrib chip; First Quantum Minerals Ltd. holds 80.0% of this project.