Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | — | — | — | — |
| Total Resources | — | — | — | — |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | 33.10 Mt | 1.03 g/t | 1.10 Moz | 02 Apr 2014 |
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | — | — | — | — |
| Total Resources | — | — | — | — |
| Proved | — | — | — | — |
| Probable | — |
| Category | Tonnes (Mt) | Grade (% Co) | Contained (Mt Co) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | — | — | — | — |
| Total Resources | — | — | — | — |
| Proved | — | — | — | — |
| Probable | — |
| Category | Tonnes (Mt) | Au | Cu | Co | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (% Cu) | Contained (Mt Cu) | Grade (% Co) | Contained (Mt Co) | |||||
| Total Reserves | 33.10 Mt | 1.03 g/t | 1.10 Moz | 0.04% | 0.01 Mt Cu | 0.11% | 0.04 Mt Co | 02 Apr 2014 | ||
| — |
| — |
| Total Reserves | 33.10 Mt | 0.04% | 0.01 Mt Cu | 02 Apr 2014 |
| — |
| — |
| Total Reserves | 33.10 Mt | 0.11% | 0.04 Mt Co | 02 Apr 2014 |
notes (3)Source: Fortune Minerals Retains P&E Mining Consultants Inc. to Prepare the New Reserve Estimates, Mine Plan & Production Schedule for the Updated NICO Project Feasibility Study · published 28 Oct 2025 Ref: 2014 Feasibility Study summary paragraph
QA notes:
|