Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 432.00 Mt | 1.24 g/t | 17.20 Moz | 31 July 2025 |
| Inferred | 358.00 Mt | 1.04 g/t | 11.90 Moz | 31 July 2025 |
| Total Resources | 790.00 Mt | 1.15 g/t | 29.10 Moz | 31 July 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | |||||
| Indicated | 432.00 Mt | 1.24 g/t | 17.20 Moz | 31 July 2025 | As of July 2025 resource summary paragraphUnverified | |
notes (3)Source: Freegold Drills 1.43 g/t Au over 74.9 m at Golden Summit as 50,000 m 2026 Drill Program Accelerates Towards PFS · published 05 May 2026 Ref: As of July 2025 resource summary paragraph
|
| Inferred | 358.00 Mt | 1.04 g/t | 11.90 Moz | 31 July 2025 | As of July 2025 resource summary paragraphUnverified | notes (3)Source: Freegold Drills 1.43 g/t Au over 74.9 m at Golden Summit as 50,000 m 2026 Drill Program Accelerates Towards PFS · published 05 May 2026 Ref: As of July 2025 resource summary paragraph
|
| Total Resources | 790.00 Mt | 1.15 g/t | 29.10 Moz | 31 July 2025 | derived from 2 rows
| — |