| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 1.21 Mt | 3.00 g/t | 0.12 Moz | 31 Dec 2024 |
| Total Resources | 1.21 Mt † | 3.00 g/t † | 0.00 Moz | 31 Dec 2024 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | 1.26 Mt | 3.26 g/t | 0.13 Moz | 31 Dec 2024 |
† Tonnes and grade as published (not net): the reserve statement prints no tonnage to net out, so only Contained honours the Resources treatment on this row.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Total Resources | 1.21 Mt † | 3.00 g/t † | 0.00 Moz | 31 Dec 2024 | derived from 1 row | |
| — |
| Underground | Inferred | 1.21 Mt | 3.00 g/t | 0.12 Moz | 31 Dec 2024 | Table 2. Consolidated Mineral Resources as at December 31, 2024 / MTL Complex / Turmalina mine InferredUnverified | notes (2)Source: Jaguar Mining Reports Updated Mineral Reserves and Mineral Resources · published 31 Mar 2025 Ref: Table 2. Consolidated Mineral Resources as at December 31, 2024 / MTL Complex / Turmalina mine Inferred
|
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Underground | Total Reserves | 1.26 Mt | 3.26 g/t | 0.13 Moz | 31 Dec 2024 | Table 1. Consolidated Mineral Reserves as at December 31, 2024 / Turmalina mine sectionUnverified | notes (2)Source: Jaguar Mining Reports Updated Mineral Reserves and Mineral Resources · published 31 Mar 2025 Ref: Table 1. Consolidated Mineral Reserves as at December 31, 2024 / Turmalina mine section
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
† Total-row tonnes/grade as published (not net): the reserve statement prints no tonnage to net out, so only the contained figure honours the Resources treatment there.