Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | 103.26 Mt | 0.45% | 0.46 Mt Cu | 25 Aug 2025 |
| Indicated | 108.51 Mt | 0.35% | 0.38 Mt Cu | 25 Aug 2025 |
| Inferred | 20.05 Mt | 0.29% | 0.06 Mt Cu | 25 Aug 2025 |
| Total Resources | 53.22 Mt | 0.29% | 0.16 Mt Cu | 25 Aug 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | 178.60 Mt | 0.42% | 0.75 Mt Cu | 25 Aug 2025 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Cu | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (% Cu) | Contained (Mt Cu) | |||||
| Measured | 103.26 Mt | 0.45% | 0.46 Mt Cu | 25 Aug 2025 | 18Unverified | |
notes (4)Ref: 18
QA notes:
|
| Indicated | 108.51 Mt | 0.35% | 0.38 Mt Cu | 25 Aug 2025 | 18Unverified | notes (4)Ref: 18
QA notes:
|
| Inferred | 20.05 Mt | 0.29% | 0.06 Mt Cu | 25 Aug 2025 | 18Unverified | notes (5)Ref: 18
QA notes:
|
| Total Resources | 53.22 Mt | 0.29% | 0.16 Mt Cu | 25 Aug 2025 | 18Unverified | notes (4)Ref: 18
QA notes:
|
| Category | Tonnes (Mt) | Cu | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (% Cu) | Contained (Mt Cu) | |||||
| Total Reserves | 178.60 Mt | 0.42% | 0.75 Mt Cu | 25 Aug 2025 | Highlights / Maiden Proven and Probable Mineral ReservesUnverified | notes (3)Source: MOD Feasibility Study Confirms Robust Capital Intensity and 31%+ IRR; Maiden Ore Reserve · published 25 Aug 2025 Ref: Highlights / Maiden Proven and Probable Mineral Reserves
QA notes:
|
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.