Reported figure
- Area
- Whole project
- Basis
- 100%
- Ore tonnes (t)
- 41700000.0000
- Grade
- 0.6300
- Contained (oz)
- 844632.2631
- Classification
- Reserve
Source trail
Published 2026-05-27
Verification
Approved; not independently verified · Model extracted
QA WARN: whole-project total_reserve of 41,700,000.0 t has missing components — no proved/probable rows are stored beside it. Reserve categories are exhaustive, so the proved and probable cell(s) of the printed total line were likely dropped by extraction (live t52/t53: Boddington whole-project proved+probable Cu and Red Chris probable Au/Cu — four printed cells never emitted, found only by audit). Check the printed line for a category split; if the issuer prints none, dismiss. | QA approve (t104 q1): print-verified whole-project reserve: "Proven and Probable reserves of 41.7 million tonnes at 0.63g/t gold, 0.44% copper and 1.64g/t silver"; the release prints no separate Proven/Probable cells and cites the PFS Technical Report dated March 31, 2025. | t104v