Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | 14.90 Mt | 131.00 g/t | 62.60 Moz | 31 Oct 2022 |
| Indicated | 39.40 Mt | 110.00 g/t | 139.20 Moz | 31 Oct 2022 |
| M&I = Measured + Indicated (overlaps both) | 54.30 Mt | 116.00 g/t | 201.80 Moz | 31 Oct 2022 |
| Inferred | 4.60 Mt | 88.00 g/t | 13.00 Moz | 31 Oct 2022 |
| Total Resources | 58.90 Mt | 113.59 g/t | 214.80 Moz | 31 Oct 2022 |
| Proved | 15.10 Mt | 121.00 g/t | 58.80 Moz | 19 June 2024 |
| Probable | 36.90 Mt | 98.00 g/t | 116.60 Moz | 19 June 2024 |
| Total Reserves | 52.00 Mt | 105.00 g/t | 175.40 Moz | 19 June 2024 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Ag | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Ag) | Contained (Moz Ag) | ||||||
| Total | Measured | 14.90 Mt | 131.00 g/t | 62.60 Moz | 31 Oct 2022 | Table 6: Mineral Resource as of October 31, 2022Unverified | |
notes (4)Source: New Pacific Metals Reports Results of its Pre-Feasibility Study of the Silver Sand Project Post-Tax US$740 NPV (5%), 37% IRR, 157 Million Ounces of Silver · published 26 June 2024 Ref: Table 6: Mineral Resource as of October 31, 2022
QA notes:
|
| Total | Indicated | 39.40 Mt | 110.00 g/t | 139.20 Moz | 31 Oct 2022 | Table 6: Mineral Resource as of October 31, 2022Unverified | notes (4)Source: New Pacific Metals Reports Results of its Pre-Feasibility Study of the Silver Sand Project Post-Tax US$740 NPV (5%), 37% IRR, 157 Million Ounces of Silver · published 26 June 2024 Ref: Table 6: Mineral Resource as of October 31, 2022
QA notes:
|
| Total | M&I = Measured + Indicated (overlaps both) | 54.30 Mt | 116.00 g/t | 201.80 Moz | 31 Oct 2022 | Table 6: Mineral Resource as of October 31, 2022Unverified | notes (4)Source: New Pacific Metals Reports Results of its Pre-Feasibility Study of the Silver Sand Project Post-Tax US$740 NPV (5%), 37% IRR, 157 Million Ounces of Silver · published 26 June 2024 Ref: Table 6: Mineral Resource as of October 31, 2022
QA notes:
|
| Total | Inferred | 4.60 Mt | 88.00 g/t | 13.00 Moz | 31 Oct 2022 | Table 6: Mineral Resource as of October 31, 2022Unverified | notes (4)Source: New Pacific Metals Reports Results of its Pre-Feasibility Study of the Silver Sand Project Post-Tax US$740 NPV (5%), 37% IRR, 157 Million Ounces of Silver · published 26 June 2024 Ref: Table 6: Mineral Resource as of October 31, 2022
QA notes:
|
| Total | Total Resources | 58.90 Mt | 113.59 g/t | 214.80 Moz | 31 Oct 2022 | derived from 3 rows | — |
| Area | Category | Tonnes (Mt) | Ag | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Ag) | Contained (Moz Ag) | ||||||
| Proved | 15.10 Mt | 121.00 g/t | 58.80 Moz | 19 June 2024 | New Pacific Metals Reports Results of its Pre-Feasibility Study of the Silver Sand Project Post-Tax US$740 NPV (5%), 37% IRR, 157 Million Ounces of SilverManual entry | notes (8)Source: New Pacific Metals Reports Results of its Pre-Feasibility Study of the Silver Sand Project Post-Tax US$740 NPV (5%), 37% IRR, 157 Million Ounces of Silver · published 26 June 2024
QA notes:
| |
| Probable | 36.90 Mt | 98.00 g/t | 116.60 Moz | 19 June 2024 | New Pacific Metals Reports Results of its Pre-Feasibility Study of the Silver Sand Project Post-Tax US$740 NPV (5%), 37% IRR, 157 Million Ounces of SilverManual entry | ||
| Total Reserves | 52.00 Mt | 105.00 g/t | 175.40 Moz | 19 June 2024 | New Pacific Metals Reports Results of its Pre-Feasibility Study of the Silver Sand Project Post-Tax US$740 NPV (5%), 37% IRR, 157 Million Ounces of SilverManual entry | notes (8)Source: | |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. “M&I” is the issuer's printed Measured + Indicated subtotal: it overlaps the Measured and Indicated rows and is never added alongside them. All derived totals and rollups on this site already exclude the overlapping rows.