These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | 1.70 Mt | 1.23 g/t | 0.07 Moz | 30 June 2026 |
| Indicated | 10.80 Mt | 1.37 g/t | 0.48 Moz | 30 June 2026 |
| M&I = Measured + Indicated (overlaps both) | 12.50 Mt | 1.35 g/t | 0.54 Moz | 30 June 2026 |
| Inferred | 2.10 Mt | 1.00 g/t | 0.06 Moz | 30 June 2026 |
| Total Resources | 4.80 Mt | 1.00 g/t | 0.15 Moz | 30 June 2026 |
| Proved | 1.00 Mt | 1.34 g/t | 0.04 Moz | 30 June 2026 |
| Probable | 4.10 Mt | 1.43 g/t | 0.19 Moz | 30 June 2026 |
| Total Reserves | 5.10 Mt | 1.41 g/t | 0.23 Moz | 30 June 2026 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Measured | 1.70 Mt | 1.23 g/t | 0.07 Moz | 30 June 2026 | 3Unverified | |
notes (5)Ref: 3
QA notes:
|
| Total | Indicated | 10.80 Mt | 1.37 g/t | 0.48 Moz | 30 June 2026 | 3Unverified | notes (4)Ref: 3
QA notes:
|
| Total | M&I = Measured + Indicated (overlaps both) | 12.50 Mt | 1.35 g/t | 0.54 Moz | 30 June 2026 | 3Unverified | notes (4)Ref: 3
QA notes:
|
| Total | Inferred | 2.10 Mt | 1.00 g/t | 0.06 Moz | 30 June 2026 | 3Unverified | notes (4)Ref: 3
QA notes:
|
| Total | Total Resources | 4.80 Mt | 1.00 g/t | 0.15 Moz | 30 June 2026 | Unverified | — |
| Bagoé | Measured | 0.20 Mt | 1.60 g/t | 0.01 Moz | 30 June 2026 | 7Unverified | notes (7)Ref: 7
QA notes:
|
| Bagoé | Indicated | 1.10 Mt | 3.05 g/t | 0.11 Moz | 30 June 2026 | 7Unverified | notes (7)Ref: 7
QA notes:
|
| Bagoé | M&I = Measured + Indicated (overlaps both) | 1.40 Mt | 2.80 g/t | 0.12 Moz | 30 June 2026 | 7Unverified | notes (7)Ref: 7
QA notes:
|
| Bagoé | Inferred | 0.00 Mt | 1.40 g/t | 2 koz | 30 June 2026 | 7Unverified | notes (6)Ref: 7
QA notes:
|
| Fimbiasso | Measured | 0.20 Mt | 1.48 g/t | 0.01 Moz | 30 June 2026 | 7Unverified | notes (7)Ref: 7
QA notes:
|
| Fimbiasso | Indicated | 1.00 Mt | 1.68 g/t | 0.05 Moz | 30 June 2026 | 7Unverified | notes (7)Ref: 7
QA notes:
|
| Fimbiasso | M&I = Measured + Indicated (overlaps both) | 1.20 Mt | 1.65 g/t | 0.06 Moz | 30 June 2026 | 7Unverified | notes (7)Ref: 7
QA notes:
|
| Fimbiasso | Inferred | 0.00 Mt | 1.70 g/t | 0.00 Moz | 30 June 2026 | 7Unverified | notes (6)Ref: 7
QA notes:
|
| Sissingué deposit | Measured | 0.60 Mt | 0.86 g/t | 0.02 Moz | 30 June 2026 | 7Unverified | notes (7)Ref: 7
QA notes:
|
| Sissingué deposit | Indicated | 8.70 Mt | 1.12 g/t | 0.31 Moz | 30 June 2026 | 7Unverified | notes (6)Ref: 7
QA notes:
|
| Sissingué deposit | M&I = Measured + Indicated (overlaps both) | 9.30 Mt | 1.10 g/t | 0.33 Moz | 30 June 2026 | 7Unverified | notes (6)Ref: 7
QA notes:
|
| Sissingué deposit | Inferred | 2.00 Mt | 0.90 g/t | 0.06 Moz | 30 June 2026 | 7Unverified | notes (6)Ref: 7
QA notes:
|
| Stockpiles | Measured | 0.60 Mt | 1.38 g/t | 0.03 Moz | 30 June 2026 | 7Unverified | notes (5)Ref: 7
QA notes:
|
| Stockpiles | M&I = Measured + Indicated (overlaps both) | 0.60 Mt | 1.38 g/t | 0.03 Moz | 30 June 2026 | 7Unverified | notes (5)Ref: 7
QA notes:
|
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Proved | 1.00 Mt | 1.34 g/t | 0.04 Moz | 30 June 2026 | 3Unverified | notes (4)Ref: 3
QA notes:
|
| Total | Probable | 4.10 Mt | 1.43 g/t | 0.19 Moz | 30 June 2026 | 3Unverified | notes (4) |
| Total | Total Reserves | 5.10 Mt | 1.41 g/t | 0.23 Moz | 30 June 2026 | 3Unverified | notes (4) |
| Bagoé | Proved | 0.10 Mt | 1.66 g/t | 0.01 Moz | 30 June 2026 | 15Unverified | notes (7) |
| Bagoé | Probable | 0.90 Mt | 2.02 g/t | 0.06 Moz | 30 June 2026 | 15Unverified | notes (7) |
| Bagoé | Total Reserves | 1.00 Mt | 1.98 g/t | 0.06 Moz | 30 June 2026 | 15Manual entry | notes (7)Ref: 15 |
| Fimbiasso | Proved | 0.00 Mt | 1.38 g/t | 1 koz | 30 June 2025 | 11Unverified | notes (5) |
| Fimbiasso | Probable | 0.20 Mt | 2.69 g/t | 0.01 Moz | 30 June 2025 | 11Unverified | notes (5) |
| Fimbiasso | Total Reserves | 0.20 Mt | 2.55 g/t | 0.01 Moz | 30 June 2025 | 11Unverified | notes (5) |
| Sissingué deposit | Proved | 0.30 Mt | 1.10 g/t | 0.01 Moz | 30 June 2026 | 15Unverified | notes (7) |
| Sissingué deposit | Probable | 3.30 Mt | 1.28 g/t | 0.13 Moz | 30 June 2026 | 15Unverified | notes (7)Source: |
| Sissingué deposit | Total Reserves | 3.50 Mt | 1.27 g/t | 0.14 Moz | 30 June 2026 | 15Unverified | notes (7) |
| Stockpiles | Proved | 0.60 Mt | 1.38 g/t | 0.03 Moz | 30 June 2026 | 15Unverified | notes (5) |
| Stockpiles | Total Reserves | 0.60 Mt | 1.38 g/t | 0.03 Moz | 30 June 2026 | 15Unverified | notes (5) |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. “M&I” is the issuer's printed Measured + Indicated subtotal: it overlaps the Measured and Indicated rows and is never added alongside them. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.
Figures are on a 100% project basis unless a row carries the attrib chip; Perseus Mining Limited Ordinary Shares holds 86.0% of this project.