Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | 34.92 Mt | 0.55 g/t | 0.62 Moz | 20 June 2025 |
| Indicated | 23.71 Mt | 0.40 g/t | 0.31 Moz | 20 June 2025 |
| Inferred | 9.11 Mt | 0.92 g/t | 0.27 Moz | 20 June 2025 |
| Total Resources | 27.56 Mt | 0.77 g/t | 0.68 Moz | 20 June 2025 |
| Proved | 24.22 Mt | 0.43 g/t | 0.33 Moz | 22 Oct 2024 |
| Probable | 16.07 Mt | 0.37 g/t | 0.19 Moz | 22 Oct 2024 |
| Total Reserves | 40.29 Mt | 0.40 g/t | 0.52 Moz | 22 Oct 2024 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | 34.92 Mt | 50.00 g/t | 56.15 Moz | 20 June 2025 |
| Indicated | 23.71 Mt | 36.00 g/t | 27.28 Moz | 20 June 2025 |
| Inferred | 9.11 Mt | 142.00 g/t | 41.59 Moz | 20 June 2025 |
| Total Resources | 27.56 Mt | 119.98 g/t | 106.32 Moz | 20 June 2025 |
| Proved |
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | 1.01 Mt | 0.13% | 1.31 kt Cu | 20 June 2025 |
| Indicated | 1.48 Mt | 0.08% | 1.12 kt Cu | 20 June 2025 |
| Inferred | 4.12 Mt | 0.32% | 0.01 Mt Cu | 20 June 2025 |
| Total Resources | 6.60 Mt | 0.24% | 0.02 Mt Cu | 20 June 2025 |
| Proved | — | — | — | — |
| Probable |
| Category | Tonnes (Mt) | Grade (% Zn) | Contained (Mt Zn) | As at |
|---|---|---|---|---|
| Measured | 1.01 Mt | 0.92% | 0.01 Mt Zn | 20 June 2025 |
| Indicated | 1.48 Mt | 0.39% | 0.01 Mt Zn | 20 June 2025 |
| Inferred | 4.12 Mt | 0.89% | 0.04 Mt Zn | 20 June 2025 |
| Total Resources | 6.60 Mt | 0.78% | 0.05 Mt Zn | 20 June 2025 |
| Proved | — | — | — | — |
| Probable |
| Category | Tonnes (Mt) | Grade (% Pb) | Contained (Mt Pb) | As at |
|---|---|---|---|---|
| Measured | 1.01 Mt | 0.54% | 0.01 Mt Pb | 20 June 2025 |
| Indicated | 1.48 Mt | 0.24% | 3.53 kt Pb | 20 June 2025 |
| Inferred | 4.12 Mt | 0.75% | 0.03 Mt Pb | 20 June 2025 |
| Total Resources | 6.60 Mt | 0.60% | 0.04 Mt Pb | 20 June 2025 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | Ag | Cu | Zn | Pb | As at | Source | Provenance | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Cu) | Contained (Mt Cu) | Grade (% Zn) | Contained (Mt Zn) | Grade (% Pb) | Contained (Mt Pb) | ||||||
| Total | Measured | ||||||||||||||
| 14.70 g/t |
| 11.45 Moz |
| 22 Oct 2024 |
| Probable | 16.07 Mt | 15.30 g/t | 7.90 Moz | 22 Oct 2024 |
| Total Reserves | 40.29 Mt | 14.90 g/t | 19.35 Moz | 22 Oct 2024 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| 34.92 Mt |
| 0.55 g/t | 0.62 Moz |
| 50.00 g/t | 56.15 Moz |
| — | — |
| — | — |
| — | — |
| 20 June 2025 |
| Table 10: Mineral Resource Estimate - TotalUnverified |
notes (5)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 10: Mineral Resource Estimate - Total
QA notes:
|
| Total | Indicated | 23.71 Mt | 0.40 g/t | 0.31 Moz | 36.00 g/t | 27.28 Moz | — | — | — | — | — | — | 20 June 2025 | Table 10: Mineral Resource Estimate - TotalUnverified | notes (5)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 10: Mineral Resource Estimate - Total
QA notes:
|
| Total | Inferred | 9.11 Mt | 0.92 g/t | 0.27 Moz | 142.00 g/t | 41.59 Moz | — | — | — | — | — | — | 20 June 2025 | Table 10: Mineral Resource Estimate - TotalUnverified | notes (5)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 10: Mineral Resource Estimate - Total
QA notes:
|
| Total | Total Resources | 6.60–27.56 Mt | 0.77 g/t | 0.68 Moz | 119.98 g/t | 106.32 Moz | 0.24% | 0.02 Mt Cu | 0.78% | 0.05 Mt Zn | 0.60% | 0.04 Mt Pb | 20 June 2025 | derived from 5 rows
| — |
| Out-Of-Pit | Measured | 1.01 Mt | 1.05 g/t | 0.03 Moz | 453.00 g/t | 14.70 Moz | 0.13% | 1.31 kt Cu | 0.92% | 0.01 Mt Zn | 0.54% | 0.01 Mt Pb | 20 June 2025 | Table 10: Mineral Resource EstimateUnverified | notes (3)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 10: Mineral Resource Estimate
|
| Out-Of-Pit | Indicated | 1.37 Mt | 1.05 g/t | 0.05 Moz | 398.00 g/t | 17.59 Moz | 0.08% | 1.1 kt Cu | 0.41% | 0.01 Mt Zn | 0.24% | 3.3 kt Pb | 20 June 2025 | Table 10: Mineral Resource EstimateUnverified | notes (3)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 10: Mineral Resource Estimate
|
| Out-Of-Pit | Inferred | 4.10 Mt | 1.58 g/t | 0.21 Moz | 294.00 g/t | 38.82 Moz | 0.32% | 0.01 Mt Cu | 0.89% | 0.04 Mt Zn | 0.75% | 0.03 Mt Pb | 20 June 2025 | Table 10: Mineral Resource EstimateUnverified | notes (3)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 10: Mineral Resource Estimate
|
| Pit-Constrained Oxide | Measured | 27.73 Mt | 0.54 g/t | 0.48 Moz | 39.00 g/t | 35.03 Moz | — | — | — | — | — | — | 20 June 2025 | Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, MexicoManual entry | notes (10)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026
QA notes:
|
| Pit-Constrained Oxide | Indicated | 19.80 Mt | 0.36 g/t | 0.23 Moz | 10.00 g/t | 6.59 Moz | — | — | — | — | — | — | 20 June 2025 | Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, MexicoManual entry | notes (9)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026
QA notes:
|
| Pit-Constrained Oxide | Inferred | 4.48 Mt | 0.38 g/t | 0.05 Moz | 10.00 g/t | 1.45 Moz | — | — | — | — | — | — | 20 June 2025 | Table 10: Mineral Resource EstimateManual entry | notes (3)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 10: Mineral Resource Estimate
|
| Pit-Constrained Sulphide | Measured | 6.03 Mt | 0.54 g/t | 0.11 Moz | 31.00 g/t | 6.04 Moz | — | — | — | — | — | — | 20 June 2025 | Table 10: Mineral Resource EstimateUnverified | notes (3)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 10: Mineral Resource Estimate
|
| Pit-Constrained Sulphide | Indicated | 1.72 Mt | 0.46 g/t | 0.03 Moz | 14.00 g/t | 0.76 Moz | — | — | — | — | — | — | 20 June 2025 | Table 10: Mineral Resource EstimateUnverified | notes (4)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 10: Mineral Resource Estimate
QA notes:
|
| Pit-Constrained Sulphide | Inferred | 0.46 Mt | 0.52 g/t | 0.01 Moz | 74.00 g/t | 1.10 Moz | — | — | — | — | — | — | 20 June 2025 | Table 10: Mineral Resource EstimateUnverified | notes (4)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 10: Mineral Resource Estimate
QA notes:
|
| Stockpile | Indicated | 0.10 Mt | 0.92 g/t | 3 koz | 181.00 g/t | 0.59 Moz | 0.02% | 0.02 kt Cu | 0.10% | 0.1 kt Zn | 0.23% | 0.23 kt Pb | 20 June 2025 | Table 10: Mineral Resource EstimateUnverified | notes (3)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 10: Mineral Resource Estimate
|
| Stockpile | Inferred | 0.02 Mt | 0.46 g/t | 0.3 koz | 146.00 g/t | 0.08 Moz | 0.02% | <0.01 kt Cu | 0.09% | 0.02 kt Zn | 0.17% | 0.03 kt Pb | 20 June 2025 | Table 10: Mineral Resource EstimateManual entry | notes (4)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 10: Mineral Resource Estimate
QA notes:
|
| Tailings | Measured | 0.15 Mt | 0.29 g/t | 1 koz | 79.00 g/t | 0.37 Moz | — | — | — | — | — | — | 20 June 2025 | Table 10: Mineral Resource EstimateUnverified | notes (4)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 10: Mineral Resource Estimate
QA notes:
|
| Tailings | Indicated | 0.71 Mt | 0.26 g/t | 0.01 Moz | 77.00 g/t | 1.75 Moz | — | — | — | — | — | — | 20 June 2025 | Table 10: Mineral Resource EstimateUnverified | notes (3)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 10: Mineral Resource Estimate
|
| Tailings | Inferred | 0.05 Mt | 0.27 g/t | 1 koz | 81.00 g/t | 0.13 Moz | — | — | — | — | — | — | 20 June 2025 | Table 10: Mineral Resource EstimateUnverified | notes (4)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 10: Mineral Resource Estimate
QA notes:
|
| Area | Category | Tonnes (Mt) | Au | Ag | Cu | Zn | Pb | As at | Source | Provenance | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Cu) | Contained (Mt Cu) | Grade (% Zn) | Contained (Mt Zn) | Grade (% Pb) | Contained (Mt Pb) | ||||||
| Total | Proved | 24.22 Mt | 0.43 g/t | 0.33 Moz | 14.70 g/t | 11.45 Moz | — | — | — | — | — | — | 22 Oct 2024 | Table 9: PFS Mineral Reserves Summary - Total ProvenUnverified | notes (3)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 9: PFS Mineral Reserves Summary - Total Proven
QA notes:
|
| Total | Probable | 16.07 Mt | 0.37 g/t | 0.19 Moz | 15.30 g/t | 7.90 Moz | — | — | — | — | — | — | 22 Oct 2024 | Table 9: PFS Mineral Reserves Summary - Total ProbableUnverified | |
| Total | Total Reserves | 40.29 Mt | 0.40 g/t | 0.52 Moz | 14.90 g/t | 19.35 Moz | — | — | — | — | — | — | 22 Oct 2024 | Table 9: PFS Mineral Reserves Summary - Total 2PUnverified | |
| Oxide | Proved | 19.56 Mt | 0.40 g/t | 0.25 Moz | 16.40 g/t | 10.32 Moz | — | — | — | — | — | — | 22 Oct 2024 | Table 9: PFS Mineral Reserves SummaryUnverified | notes (3) |
| Oxide | Probable | 14.80 Mt | 0.37 g/t | 0.18 Moz | 13.70 g/t | 6.52 Moz | — | — | — | — | — | — | 22 Oct 2024 | Table 9: PFS Mineral Reserves SummaryUnverified | notes (3) |
| Sulphide | Proved | 4.66 Mt | 0.52 g/t | 0.08 Moz | 7.60 g/t | 1.14 Moz | — | — | — | — | — | — | 22 Oct 2024 | Table 9: PFS Mineral Reserves SummaryUnverified | notes (3) |
| Sulphide | Probable | 1.27 Mt | 0.43 g/t | 0.02 Moz | 33.80 g/t | 1.38 Moz | — | — | — | — | — | — | 22 Oct 2024 | Table 9: PFS Mineral Reserves SummaryUnverified | notes (3) |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.
notes (3)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 9: PFS Mineral Reserves Summary - Total Probable
QA notes:
|
notes (2)Source: Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico · published 20 Jan 2026 Ref: Table 9: PFS Mineral Reserves Summary - Total 2P
|