These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | 0.19 Mt | 1.66 g/t | 0.01 Moz | 30 June 2026 |
| Indicated | 1.69 Mt | 1.58 g/t | 0.09 Moz | 30 June 2026 |
| M&I = Measured + Indicated (overlaps both) | 1.88 Mt | 1.59 g/t | 0.10 Moz | 30 June 2026 |
| Inferred | 0.54 Mt | 1.49 g/t | 0.03 Moz | 30 June 2026 |
| Total Resources | 2.12 Mt | 1.61 g/t | 0.11 Moz | 30 June 2026 |
| Proved | 0.08 Mt | 1.29 g/t | 3 koz | 30 June 2026 |
| Probable | 0.22 Mt | 1.24 g/t | 0.01 Moz | 30 June 2026 |
| Total Reserves | 0.31 Mt | 1.25 g/t | 0.01 Moz | 30 June 2026 |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
| Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | |||||
| Measured | 0.19 Mt | 1.66 g/t | 0.01 Moz | 30 June 2026 | 5Unverified | |
notes (5)Ref: 5
QA notes:
|
| Indicated | 1.69 Mt | 1.58 g/t | 0.09 Moz | 30 June 2026 | 5Unverified | notes (4)Ref: 5
QA notes:
|
| M&I = Measured + Indicated (overlaps both) | 1.88 Mt | 1.59 g/t | 0.10 Moz | 30 June 2026 | 5Unverified | notes (4)Ref: 5
QA notes:
|
| Inferred | 0.54 Mt | 1.49 g/t | 0.03 Moz | 30 June 2026 | 5Unverified | notes (4)Ref: 5
QA notes:
|
| Total Resources | 2.12 Mt | 1.61 g/t | 0.11 Moz | 30 June 2026 | 5Unverified | notes (4)Ref: 5
QA notes:
|
| Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | |||||
| Proved | 0.08 Mt | 1.29 g/t | 3 koz | 30 June 2026 | 24Unverified | notes (5)Ref: 24
QA notes:
|
| Probable | 0.22 Mt | 1.24 g/t | 0.01 Moz | 30 June 2026 | 24Unverified | notes (5) |
| Total Reserves | 0.31 Mt | 1.25 g/t | 0.01 Moz | 30 June 2026 | 24Unverified | notes (5) |
Rows are hierarchical, not additive — do not sum a column across rows. “M&I” is the issuer's printed Measured + Indicated subtotal: it overlaps the Measured and Indicated rows and is never added alongside them. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.