Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 17.00 Mt | 0.25 g/t | 0.13 Moz | 30 June 2025 |
| Total Resources | 17.00 Mt | 0.25 g/t | 0.13 Moz | 30 June 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | 43.00 Mt | 75.00 g/t | 104.00 Moz | 30 June 2025 |
| Indicated | 12.00 Mt | 57.00 g/t | 21.00 Moz | 30 June 2025 |
| Inferred | 24.60 Mt | 71.85 g/t | 57.51 Moz | 30 June 2025 |
| Total Resources | 79.60 Mt | 71.31 g/t | 182.51 Moz | 30 June 2025 |
| Proved | — | — | — | — |
| Probable |
| Category | Tonnes (Mt) | Grade (% Zn) | Contained (Mt Zn) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 36.00 Mt | 0.45% | 0.16 Mt Zn | 30 June 2025 |
| Inferred | 17.00 Mt | 0.71% | 0.12 Mt Zn | 30 June 2025 |
| Total Resources | 53.00 Mt | 0.53% | 0.28 Mt Zn | 30 June 2025 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | Ag | Zn | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Zn) | Contained (Mt Zn) | ||||||
| Total | Total Resources | 17.00–79.60 Mt | 0.25 g/t | 0.13 Moz | |||||||
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| 182.51 Moz |
| 0.53% | 0.28 Mt Zn |
| 30 June 2025 |
| — |
| Langtry | Inferred | 24.00 Mt | — | — | 73.00 g/t | 57.00 Moz | — | — | 30 June 2025 | Highlights of the MRE — 'Updated Langtry MRE: 24 Mt at 73 g/t Ag for 57 Moz Ag (Inferred)'Unverified | notes (3)Source: Apollo Files NI 43-101 Technical Report for the Calico Silver Project Updated Mineral Resource Estimate · published 16 Oct 2025 Ref: Highlights of the MRE — 'Updated Langtry MRE: 24 Mt at 73 g/t Ag for 57 Moz Ag (Inferred)'
QA notes:
|
| Waterloo | Measured | 43.00 Mt | — | — | 75.00 g/t | 104.00 Moz | — | — | 30 June 2025 | Table 1: Calico Project 2025 MRE. Effective June 30, 2025.Unverified | notes (3)Source: Apollo Increases Measured and Indicated Silver Resource Estimate at Calico Project · published 04 Sept 2025 Ref: Table 1: Calico Project 2025 MRE. Effective June 30, 2025.
|
| Waterloo | Indicated | 12.00–36.00 Mt | — | — | 57.00 g/t | 21.00 Moz | 0.45% | 0.16 Mt Zn | 30 June 2025 | Table 1: Calico Project 2025 MRE. Effective June 30, 2025.Unverified | notes (4)Source: Apollo Increases Measured and Indicated Silver Resource Estimate at Calico Project · published 04 Sept 2025 Ref: Table 1: Calico Project 2025 MRE. Effective June 30, 2025.
QA notes:
|
| Waterloo | Inferred | 0.60–17.00 Mt | 0.25 g/t | 0.13 Moz | 26.00 g/t | 0.51 Moz | 0.71% | 0.12 Mt Zn | 30 June 2025 | Highlights of the MRE — 'Inferred: 17 Mt @ 3.9% BaSO4 and 0.71% Zn'Unverified | notes (3)Source: Apollo Files NI 43-101 Technical Report for the Calico Silver Project Updated Mineral Resource Estimate · published 16 Oct 2025 Ref: Highlights of the MRE — 'Inferred: 17 Mt @ 3.9% BaSO4 and 0.71% Zn'
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.