Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 3.15 Mt | 1.12 g/t | 0.11 Moz | 06 Jan 2025 |
| Inferred | 2.30 Mt | 1.22 g/t | 0.09 Moz | 06 Jan 2025 |
| Total Resources | 5.45 Mt | 1.16 g/t | 0.21 Moz | 06 Jan 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 3.15 Mt | 19.40 g/t | 1.93 Moz | 06 Jan 2025 |
| Inferred | 2.30 Mt | 14.50 g/t | 1.08 Moz | 06 Jan 2025 |
| Total Resources | 5.45 Mt | 17.33 g/t | 3.01 Moz | 06 Jan 2025 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Au | Ag | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | |||||
| Indicated | 3.15 Mt | 1.12 g/t | 0.11 Moz | 19.40 g/t | 1.93 Moz | 06 Jan 2025 | Mineral Resource Estimates section — Indicated paragraphUnverified | |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
notes (4)Source: Baru Gold Files Ni 43-101 Technical Report on the Sangihe Gold and Silver Project to Prepare for Production Operations · published 14 Feb 2025 Ref: Mineral Resource Estimates section — Indicated paragraph
QA notes:
|
| Inferred | 2.30 Mt | 1.22 g/t | 0.09 Moz | 14.50 g/t | 1.08 Moz | 06 Jan 2025 | Mineral Resource Estimates section — Inferred paragraphUnverified | notes (3)Source: Baru Gold Files Ni 43-101 Technical Report on the Sangihe Gold and Silver Project to Prepare for Production Operations · published 14 Feb 2025 Ref: Mineral Resource Estimates section — Inferred paragraph
|
| Total Resources | 5.45 Mt | 1.16 g/t | 0.21 Moz | 17.33 g/t | 3.01 Moz | 06 Jan 2025 | derived from 2 rows | — |
Figures are on a 100% project basis unless a row carries the attrib chip; Baru Gold Corp. holds 70.0% of this project.