Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 1.01 Mt | 46.50 g/t | 1.51 Moz | 06 Oct 2017 |
| Total Resources | 1.01 Mt | 46.50 g/t | 1.51 Moz | 06 Oct 2017 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (% Zn) | Contained (Mt Zn) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 1.01 Mt | 10.24% | 0.10 Mt Zn | 06 Oct 2017 |
| Total Resources | 1.01 Mt | 10.24% | 0.10 Mt Zn | 06 Oct 2017 |
| Proved | — | — | — | — |
| Probable | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Ag | Zn | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|
| Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Zn) | Contained (Mt Zn) | |||||
| Inferred | 1.01 Mt | 46.50 g/t | 1.51 Moz | 10.24% | 0.10 Mt Zn | 06 Oct 2017 | Seal Zinc Deposit — prose paragraph below Table 1 footnotesUnverified | |
| — |
| — |
| Total Reserves | — | — | — | — |
notes (3)Source: Aston Bay Files Technical Report for Storm Copper Project Initial Mineral Resource Estimate · published 17 Apr 2025 Ref: Seal Zinc Deposit — prose paragraph below Table 1 footnotes
QA notes:
|
| Total Resources | 1.01 Mt | 46.50 g/t | 1.51 Moz | 10.24% | 0.10 Mt Zn | 06 Oct 2017 | derived from 1 row | — |
Figures are on a 100% project basis unless a row carries the attrib chip; Aston Bay Holdings Ltd. holds 20.0% of this project.