These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 39.41 Mt | 0.70 g/t | 0.88 Moz | 29 July 2025 |
| Inferred | 26.43 Mt | 0.70 g/t | 0.60 Moz | 29 July 2025 |
| Total Resources | 65.84 Mt | 0.70 g/t | 1.48 Moz | 29 July 2025 |
| Proved | — | — | — | — |
| Probable | 6.18 Mt | 0.65 g/t | 0.13 Moz | 23 July 2025 |
| Total Reserves | 6.18 Mt | 0.65 g/t | 0.13 Moz | 23 July 2025 |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Total Resources | 65.84 Mt | 0.70 g/t | 1.48 Moz | 29 July 2025 | derived from 11 rows | |
| — |
| Central | Indicated | 3.36 Mt | 0.52 g/t | 0.06 Moz | 23 July 2025 | Table 4. Indicated and Inferred resources of oxide material onlyUnverified | notes (4)Source: Cabral Gold Announces Results of Updated Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil · published 29 July 2025 Ref: Table 4. Indicated and Inferred resources of oxide material only
|
| Central | Inferred | 0.94 Mt | 0.45 g/t | 0.01 Moz | 23 July 2025 | Table 4. Indicated and Inferred resources of oxide material onlyUnverified | notes (4)Source: Cabral Gold Announces Results of Updated Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil · published 29 July 2025 Ref: Table 4. Indicated and Inferred resources of oxide material only
|
| Fresh basement material | Indicated | 12.29 Mt | 1.14 g/t | 0.45 Moz | 12 Oct 2022 | About Cabral Gold Inc. section — inline resource summaryUnverified | notes (3)Source: Cabral Gold Announces Filing of NI 43-101 Technical Report for Updated Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil · published 11 Sept 2025 Ref: About Cabral Gold Inc. section — inline resource summary
QA notes:
|
| Fresh basement material | Inferred | 13.63 Mt | 1.04 g/t | 0.46 Moz | 12 Oct 2022 | About Cabral Gold Inc. section — inline resource summaryUnverified | notes (3)Source: Cabral Gold Announces Filing of NI 43-101 Technical Report for Updated Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil · published 11 Sept 2025 Ref: About Cabral Gold Inc. section — inline resource summary
QA notes:
|
| Machichie | Indicated | 1.33 Mt | 0.56 g/t | 0.02 Moz | 23 July 2025 | Table 4. Indicated and Inferred resources of oxide material onlyUnverified | notes (4)Source: Cabral Gold Announces Results of Updated Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil · published 29 July 2025 Ref: Table 4. Indicated and Inferred resources of oxide material only
|
| Machichie | Inferred | 0.71 Mt | 0.54 g/t | 0.01 Moz | 23 July 2025 | Table 4. Indicated and Inferred resources of oxide material onlyUnverified | notes (4)Source: Cabral Gold Announces Results of Updated Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil · published 29 July 2025 Ref: Table 4. Indicated and Inferred resources of oxide material only
|
| MG | Indicated | 8.86 Mt | 0.48 g/t | 0.14 Moz | 09 Oct 2024 | Table 4. Indicated and Inferred resources of oxide material onlyUnverified | notes (6)Source: Cabral Gold Announces Results of Updated Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil · published 29 July 2025 Ref: Table 4. Indicated and Inferred resources of oxide material only
QA notes:
|
| MG | Inferred | 3.14 Mt | 0.22 g/t | 0.02 Moz | 09 Oct 2024 | Table 4. Indicated and Inferred resources of oxide material onlyUnverified | notes (6)Source: Cabral Gold Announces Results of Updated Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil · published 29 July 2025 Ref: Table 4. Indicated and Inferred resources of oxide material only
QA notes:
|
| Oxide material | Indicated | 13.56 Mt | 0.50 g/t | 0.22 Moz | 29 July 2025 | About Cabral Gold Inc. section — inline resource summaryUnverified | notes (1)Source: Cabral Gold Announces Filing of NI 43-101 Technical Report for Updated Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil · published 11 Sept 2025 Ref: About Cabral Gold Inc. section — inline resource summary
|
| Oxide material | Inferred | 6.40 Mt | 0.34 g/t | 0.07 Moz | 29 July 2025 | About Cabral Gold Inc. section — inline resource summaryUnverified | notes (1)Source: Cabral Gold Announces Filing of NI 43-101 Technical Report for Updated Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil · published 11 Sept 2025 Ref: About Cabral Gold Inc. section — inline resource summary
|
| PDM | Inferred | 1.60 Mt | 0.43 g/t | 0.02 Moz | 09 Oct 2024 | Table 4. Indicated and Inferred resources of oxide material onlyUnverified | notes (3)Source: Cabral Gold Announces Results of Updated Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil · published 29 July 2025 Ref: Table 4. Indicated and Inferred resources of oxide material only
|
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Total Reserves | 6.18 Mt | 0.65 g/t | 0.13 Moz | 23 July 2025 | Table 5 Probable Mineral Reserves (gold-in-oxide material only) — Total rowUnverified | notes (3)Source: Cabral Gold Announces Results of Updated Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil · published 29 July 2025 Ref: Table 5 Probable Mineral Reserves (gold-in-oxide material only) — Total row
|
| Central | Probable | 1.51 Mt | 0.62 g/t | 0.03 Moz | 23 July 2025 | Table 5 Probable Mineral Reserves (gold-in-oxide material only)Unverified | notes (3)Source: Cabral Gold Announces Results of Updated Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil · published 29 July 2025 Ref: Table 5 Probable Mineral Reserves (gold-in-oxide material only) |
| Machichie | Probable | 0.63 Mt | 0.79 g/t | 0.02 Moz | 23 July 2025 | Table 5 Probable Mineral Reserves (gold-in-oxide material only)Unverified | notes (3)Source: Cabral Gold Announces Results of Updated Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil · published 29 July 2025 Ref: Table 5 Probable Mineral Reserves (gold-in-oxide material only) |
| MG | Probable | 4.04 Mt | 0.64 g/t | 0.08 Moz | 23 July 2025 | Table 5 Probable Mineral Reserves (gold-in-oxide material only)Unverified | notes (3)Source: Cabral Gold Announces Results of Updated Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil · published 29 July 2025 Ref: Table 5 Probable Mineral Reserves (gold-in-oxide material only) |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.