These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | 26.50 Mt | 0.48% | 0.13 Mt Cu | 08 Mar 2021 |
| Indicated | 5.66 Mt | 0.40% | 0.02 Mt Cu | 08 Mar 2021 |
| Inferred | 0.66 Mt | 0.30% | 2 kt Cu | 08 Mar 2021 |
| Total Resources | 6.85 Mt | 0.33% | 0.02 Mt Cu | 08 Mar 2021 |
| Proved | 21.81 Mt | 0.51% | 0.11 Mt Cu | 21 Sept 2021 |
| Probable | 4.17 Mt | 0.43% | 0.02 Mt Cu | 21 Sept 2021 |
| Total Reserves | 25.97 Mt | 0.49% | 0.13 Mt Cu | 21 Sept 2021 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Cu | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (% Cu) | Contained (Mt Cu) | |||||
| Measured | 26.50 Mt | 0.48% | 0.13 Mt Cu | 08 Mar 2021 | Mineral Resources tableUnverified | |
notes (3)Source: Camino Announces Filing of Pre-Feasibility Study Technical Report and Provides Update on Previously Announced Acquisition of the Puquios Copper Project · published 17 Mar 2025 Ref: Mineral Resources table
|
| Indicated | 5.66 Mt | 0.40% | 0.02 Mt Cu | 08 Mar 2021 | Mineral Resources tableUnverified | notes (4)Source: Camino Announces Filing of Pre-Feasibility Study Technical Report and Provides Update on Previously Announced Acquisition of the Puquios Copper Project · published 17 Mar 2025 Ref: Mineral Resources table
QA notes:
|
| Inferred | 0.66 Mt | 0.30% | 2 kt Cu | 08 Mar 2021 | Mineral Resources tableUnverified | notes (4)Source: Camino Announces Filing of Pre-Feasibility Study Technical Report and Provides Update on Previously Announced Acquisition of the Puquios Copper Project · published 17 Mar 2025 Ref: Mineral Resources table
QA notes:
|
| Total Resources | 6.85 Mt | 0.33% | 0.02 Mt Cu | 08 Mar 2021 | derived from 3 rows
| — |
| Category | Tonnes (Mt) | Cu | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (% Cu) | Contained (Mt Cu) | |||||
| Proved | 21.81 Mt | 0.51% | 0.11 Mt Cu | 21 Sept 2021 | Mineral Reserves tableUnverified | notes (4)Source: Camino Announces Filing of Pre-Feasibility Study Technical Report and Provides Update on Previously Announced Acquisition of the Puquios Copper Project · published 17 Mar 2025 Ref: Mineral Reserves table
QA notes:
|
| Probable | 4.17 Mt | 0.43% | 0.02 Mt Cu | 21 Sept 2021 | Mineral Reserves tableUnverified | notes (4)Source: Camino Announces Filing of Pre-Feasibility Study Technical Report and Provides Update on Previously Announced Acquisition of the Puquios Copper Project · published 17 Mar 2025 Ref: Mineral Reserves table
|
| Total Reserves | 25.97 Mt | 0.49% | 0.13 Mt Cu | 21 Sept 2021 | Mineral Reserves table — Total rowUnverified | notes (4)Source: Camino Announces Filing of Pre-Feasibility Study Technical Report and Provides Update on Previously Announced Acquisition of the Puquios Copper Project · published 17 Mar 2025 Ref: Mineral Reserves table — Total row |
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.