Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Fe) | Contained (Mt Fe) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 31.00 Mt | 6.82% | 2.10 Mt Fe | 23 Mar 2026 |
| Inferred | 71.00 Mt | 6.80% | 4.90 Mt Fe | 23 Mar 2026 |
| Total Resources | 102.00 Mt | 6.81% | 7.00 Mt Fe | 23 Mar 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Fe | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (% Fe) | Contained (Mt Fe) | |||||
| Indicated | 31.00 Mt | 6.82% | 2.10 Mt Fe | 23 Mar 2026 | Table 2: 2026 Mineral Resource EstimateUnverified | |
notes (3)Source: CoTec Announces Updated Mineral Resource and Positive Preliminary Economic Assessment for the Lac Jeannine Iron Tailings Project, Québec, Canada · published 20 May 2026 Ref: Table 2: 2026 Mineral Resource Estimate
QA notes:
|
| Inferred | 71.00 Mt | 6.80% | 4.90 Mt Fe | 23 Mar 2026 | Table 2: 2026 Mineral Resource EstimateUnverified | notes (3)Source: CoTec Announces Updated Mineral Resource and Positive Preliminary Economic Assessment for the Lac Jeannine Iron Tailings Project, Québec, Canada · published 20 May 2026 Ref: Table 2: 2026 Mineral Resource Estimate
QA notes:
|
| Total Resources | 102.00 Mt | 6.81% | 7.00 Mt Fe | 23 Mar 2026 | derived from 2 rows
| — |