Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | 0.10 Mt | 0.30 g/t | 1 koz | 17 Sept 2025 |
| Indicated | 6.30 Mt | 0.80 g/t | 0.17 Moz | 17 Sept 2025 |
| M&I = Measured + Indicated (overlaps both) | 6.40 Mt | 0.80 g/t | 0.17 Moz | 17 Sept 2025 |
| Inferred | 8.50 Mt | 1.70 g/t | 0.45 Moz | 17 Sept 2025 |
| Total Resources | 14.90 Mt | 1.31 g/t | 0.62 Moz | 17 Sept 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | 0.10 Mt | 0.50 g/t | 2 koz | 17 Sept 2025 |
| Indicated | 6.30 Mt | 7.80 g/t | 1.56 Moz | 17 Sept 2025 |
| M&I = Measured + Indicated (overlaps both) | 6.40 Mt | 7.60 g/t | 1.57 Moz | 17 Sept 2025 |
| Inferred | 8.50 Mt | 7.90 g/t | 2.17 Moz | 17 Sept 2025 |
| Total Resources |
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | 0.10 Mt | 2.70% | 4 kt Cu | 17 Sept 2025 |
| Indicated | 6.30 Mt | 2.30% | 0.15 Mt Cu | 17 Sept 2025 |
| M&I = Measured + Indicated (overlaps both) | 6.40 Mt | 2.30% | 0.15 Mt Cu | 17 Sept 2025 |
| Inferred | 8.50 Mt | 2.10% | 0.18 Mt Cu | 17 Sept 2025 |
| Total Resources |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | Ag | Cu | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Cu) | Contained (Mt Cu) | ||||||
| Total | Measured | 0.10 Mt | 0.30 g/t | 1 koz | 0.50 g/t | 2 koz | 2.70% | ||||
| 7.81 g/t |
| 3.73 Moz |
| 17 Sept 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
| 2.19% |
| 0.33 Mt Cu |
| 17 Sept 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
| 17 Sept 2025 |
| 18Unverified |
notes (6)Ref: 18
QA notes:
|
| Total | Indicated | 6.30 Mt | 0.80 g/t | 0.17 Moz | 7.80 g/t | 1.56 Moz | 2.30% | 0.15 Mt Cu | 17 Sept 2025 | 18Unverified | notes (4)Ref: 18
QA notes:
|
| Total | M&I = Measured + Indicated (overlaps both) | 6.40 Mt | 0.80 g/t | 0.17 Moz | 7.60 g/t | 1.57 Moz | 2.30% | 0.15 Mt Cu | 17 Sept 2025 | 18Unverified | notes (16)Ref: 18
QA notes:
|
| Total | Inferred | 8.50 Mt | 1.70 g/t | 0.45 Moz | 7.90 g/t | 2.17 Moz | 2.10% | 0.18 Mt Cu | 17 Sept 2025 | 18Unverified | notes (16)Ref: 18
QA notes:
|
| Total | Total Resources | 14.90 Mt | 1.31 g/t | 0.62 Moz | 7.81 g/t | 3.73 Moz | 2.19% | 0.33 Mt Cu | 17 Sept 2025 | Unverified | — |
| Cedar Bay | Indicated | 0.30 Mt | 6.00 g/t | 0.05 Moz | 9.90 g/t | 0.08 Moz | 1.60% | 4 kt Cu | 17 Sept 2025 | 18Unverified | notes (4)Ref: 18
QA notes:
|
| Cedar Bay | Inferred | 0.80 Mt | 5.10 g/t | 0.13 Moz | 11.80 g/t | 0.31 Moz | 2.00% | 0.02 Mt Cu | 17 Sept 2025 | 18Unverified | notes (4)Ref: 18
QA notes:
|
| Corner Bay | Indicated | 4.90 Mt | 0.30 g/t | 0.04 Moz | 8.40 g/t | 1.32 Moz | 2.50% | 0.12 Mt Cu | 17 Sept 2025 | 18Unverified | notes (4)Ref: 18
QA notes:
|
| Corner Bay | Inferred | 5.40 Mt | 0.20 g/t | 0.04 Moz | 8.90 g/t | 1.54 Moz | 2.70% | 0.15 Mt Cu | 17 Sept 2025 | 18Unverified | notes (4)Ref: 18
QA notes:
|
| Devlin | Measured | 0.10 Mt | 0.30 g/t | 1 koz | 0.50 g/t | 2 koz | 2.70% | 4 kt Cu | 17 Sept 2025 | 18Unverified | notes (4)Ref: 18
QA notes:
|
| Devlin | Indicated | 0.60 Mt | 0.20 g/t | 4 koz | 0.20 g/t | 0.01 Moz | 2.00% | 0.01 Mt Cu | 17 Sept 2025 | 18Unverified | notes (4)Ref: 18
QA notes:
|
| Devlin | M&I = Measured + Indicated (overlaps both) | 0.80 Mt | 0.20 g/t | 0.01 Moz | 0.30 g/t | 0.01 Moz | 2.10% | 0.02 Mt Cu | 17 Sept 2025 | 18Unverified | notes (16)Ref: 18
QA notes:
|
| Devlin | Inferred | 0.30 Mt | 0.20 g/t | 2 koz | 0.30 g/t | 3 koz | 2.00% | 0.01 Mt Cu | 17 Sept 2025 | 18Unverified | notes (4)Ref: 18
QA notes:
|
| Golden Eye | Indicated | 0.50 Mt | 4.30 g/t | 0.07 Moz | 9.90 g/t | 0.16 Moz | 1.00% | 0.01 Mt Cu | 17 Sept 2025 | 18Unverified | notes (4)Ref: 18
QA notes:
|
| Golden Eye | Inferred | 1.20 Mt | 3.40 g/t | 0.13 Moz | 7.90 g/t | 0.31 Moz | 0.90% | 0.01 Mt Cu | 17 Sept 2025 | 18Unverified | notes (4)Ref: 18
QA notes:
|
| Joe Mann | Inferred | 0.70 Mt | 6.00 g/t | 0.14 Moz | — | — | 0.20% | 2 kt Cu | 17 Sept 2025 | Chibougamau Resource Update PresentationManual entry | notes (3)
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. “M&I” is the issuer's printed Measured + Indicated subtotal: it overlaps the Measured and Indicated rows and is never added alongside them. All derived totals and rollups on this site already exclude the overlapping rows.