Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 5.41 Mt | 1.52 g/t | 0.26 Moz | 20 Apr 2022 |
| Inferred | 6.93 Mt | 1.67 g/t | 0.37 Moz | 20 Apr 2022 |
| Total Resources | 12.34 Mt | 1.60 g/t | 0.64 Moz | 20 Apr 2022 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | |||||
| Indicated | 5.41 Mt | 1.52 g/t | 0.26 Moz | 20 Apr 2022 | About DFR Gold section — Cascades Mineral Resource summaryUnverified | |
notes (1)Source: DFR Gold Inc. Announces Funding and Updates on Cascades Feasibility Study · published 10 Feb 2026 Ref: About DFR Gold section — Cascades Mineral Resource summary
|
| Inferred | 6.93 Mt | 1.67 g/t | 0.37 Moz | 20 Apr 2022 | About DFR Gold section — Cascades Mineral Resource summaryUnverified | notes (1)Source: DFR Gold Inc. Announces Funding and Updates on Cascades Feasibility Study · published 10 Feb 2026 Ref: About DFR Gold section — Cascades Mineral Resource summary
|
| Total Resources | 12.34 Mt | 1.60 g/t | 0.64 Moz | 20 Apr 2022 | derived from 2 rows | — |
Figures are on a 100% project basis unless a row carries the attrib chip; DFR Gold Inc. holds 80.0% of this project.