These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 0.89 Mt | 195.00 g/t | 5.57 Moz | 18 Feb 2026 |
| Inferred | 0.36 Mt | 149.00 g/t | 1.74 Moz | 18 Feb 2026 |
| Total Resources | 1.25 Mt | 181.70 g/t | 7.31 Moz | 18 Feb 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (% Zn) | Contained (Mt Zn) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 0.89 Mt | 4.83% | 0.04 Mt Zn | 18 Feb 2026 |
| Inferred | 0.36 Mt | 4.32% | 0.02 Mt Zn | 18 Feb 2026 |
| Total Resources | 1.25 Mt | 4.68% | 0.06 Mt Zn | 18 Feb 2026 |
| Proved | — | — | — | — |
| Probable |
| Category | Tonnes (Mt) | Grade (% Pb) | Contained (Mt Pb) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 0.89 Mt | 3.33% | 0.03 Mt Pb | 18 Feb 2026 |
| Inferred | 0.36 Mt | 2.67% | 0.01 Mt Pb | 18 Feb 2026 |
| Total Resources | 1.25 Mt | 3.14% | 0.04 Mt Pb | 18 Feb 2026 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Ag | Zn | Pb | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Zn) | Contained (Mt Zn) | Grade (% Pb) | Contained (Mt Pb) | ||||||
| Total | Total Resources | 1.25 Mt | 181.70 g/t | 7.31 Moz | 4.68% | 0.06 Mt Zn | |||||
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| 0.04 Mt Pb |
| 18 Feb 2026 |
derived from 2 rows |
| — |
| Underground | Indicated | 0.89 Mt | 195.00 g/t | 5.57 Moz | 4.83% | 0.04 Mt Zn | 3.33% | 0.03 Mt Pb | 18 Feb 2026 | Table 1: Mallay Mine Project Underground Mineral Resource Estimate, February 18, 2026Unverified | notes (3)Ref: Table 1: Mallay Mine Project Underground Mineral Resource Estimate, February 18, 2026
|
| Underground | Inferred | 0.36 Mt | 149.00 g/t | 1.74 Moz | 4.32% | 0.02 Mt Zn | 2.67% | 0.01 Mt Pb | 18 Feb 2026 | Table 1: Mallay Mine Project Underground Mineral Resource Estimate, February 18, 2026Unverified | notes (4)Ref: Table 1: Mallay Mine Project Underground Mineral Resource Estimate, February 18, 2026
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.