These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Li2O) | Contained (Mt LCE) | As at |
|---|---|---|---|---|
| Measured | 16.38 Mt | 1.62% Li2O | 0.65 Mt LCE | 30 Nov 2023 |
| Indicated | 20.53 Mt | 1.53% Li2O | 0.78 Mt LCE | 30 Nov 2023 |
| Inferred | 18.59 Mt | 1.51% Li2O | 0.69 Mt LCE | 30 Nov 2023 |
| Total Resources | 24.37 Mt | 1.60% Li2O | 0.97 Mt LCE | 30 Nov 2023 |
| Proved | 16.19 Mt | 1.58% Li2O | 0.63 Mt LCE | 28 May 2025 |
| Probable | 14.94 Mt | 1.42% Li2O | 0.53 Mt LCE | 28 May 2025 |
| Total Reserves | 31.13 Mt | 1.51% Li2O | 1.16 Mt LCE | 28 May 2025 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (% Li2O) | Contained (Mt LCE) | ||||||
| Total | Total Resources | 24.37 Mt | 1.60% Li2O | 0.97 Mt LCE | 30 Nov 2023 | derived from 9 rows | |
| — |
| Open Pit - Bolt | Inferred | 5.52 Mt | 1.23% Li2O | 0.17 Mt LCE | 30 Nov 2023 | Table 2: Summary of the Mineral Resource EstimateUnverified | notes (2)Source: FRONTIER LITHIUM'S FEASIBILITY STUDY CONFIRMS CA$932M NET PRESENT VALUE AND LOW-COST CONCENTRATE SUPPLY FOR PAK LITHIUM PROJECT · published 28 May 2025 Ref: Table 2: Summary of the Mineral Resource Estimate
|
| Open Pit - PAK | Measured | 2.59 Mt | 2.03% Li2O | 0.13 Mt LCE | 30 Nov 2023 | Table 2: Summary of the Mineral Resource EstimateUnverified | notes (3)Source: FRONTIER LITHIUM'S FEASIBILITY STUDY CONFIRMS CA$932M NET PRESENT VALUE AND LOW-COST CONCENTRATE SUPPLY FOR PAK LITHIUM PROJECT · published 28 May 2025 Ref: Table 2: Summary of the Mineral Resource Estimate
|
| Open Pit - PAK | Indicated | 1.52 Mt | 1.96% Li2O | 0.07 Mt LCE | 30 Nov 2023 | Table 2: Summary of the Mineral Resource EstimateUnverified | notes (3)Source: FRONTIER LITHIUM'S FEASIBILITY STUDY CONFIRMS CA$932M NET PRESENT VALUE AND LOW-COST CONCENTRATE SUPPLY FOR PAK LITHIUM PROJECT · published 28 May 2025 Ref: Table 2: Summary of the Mineral Resource Estimate
|
| Open Pit - PAK | Inferred | 0.12 Mt | 1.50% Li2O | 4.95 kt LCE | 30 Nov 2023 | Table 2: Summary of the Mineral Resource EstimateUnverified | notes (3)Source: FRONTIER LITHIUM'S FEASIBILITY STUDY CONFIRMS CA$932M NET PRESENT VALUE AND LOW-COST CONCENTRATE SUPPLY FOR PAK LITHIUM PROJECT · published 28 May 2025 Ref: Table 2: Summary of the Mineral Resource Estimate
QA notes:
|
| Open Pit - Spark | Measured | 13.80 Mt | 1.54% Li2O | 0.52 Mt LCE | 30 Nov 2023 | Table 2: Summary of the Mineral Resource EstimateUnverified | notes (3)Source: FRONTIER LITHIUM'S FEASIBILITY STUDY CONFIRMS CA$932M NET PRESENT VALUE AND LOW-COST CONCENTRATE SUPPLY FOR PAK LITHIUM PROJECT · published 28 May 2025 Ref: Table 2: Summary of the Mineral Resource Estimate
|
| Open Pit - Spark | Indicated | 17.30 Mt | 1.41% Li2O | 0.60 Mt LCE | 30 Nov 2023 | Table 2: Summary of the Mineral Resource EstimateUnverified | notes (3)Source: FRONTIER LITHIUM'S FEASIBILITY STUDY CONFIRMS CA$932M NET PRESENT VALUE AND LOW-COST CONCENTRATE SUPPLY FOR PAK LITHIUM PROJECT · published 28 May 2025 Ref: Table 2: Summary of the Mineral Resource Estimate
|
| Open Pit - Spark | Inferred | 10.95 Mt | 1.53% Li2O | 0.41 Mt LCE | 30 Nov 2023 | Table 2: Summary of the Mineral Resource EstimateUnverified | notes (2)Source: FRONTIER LITHIUM'S FEASIBILITY STUDY CONFIRMS CA$932M NET PRESENT VALUE AND LOW-COST CONCENTRATE SUPPLY FOR PAK LITHIUM PROJECT · published 28 May 2025 Ref: Table 2: Summary of the Mineral Resource Estimate
|
| Underground - PAK | Indicated | 1.70 Mt | 2.39% Li2O | 0.10 Mt LCE | 30 Nov 2023 | Table 2: Summary of the Mineral Resource EstimateUnverified | notes (3)Source: FRONTIER LITHIUM'S FEASIBILITY STUDY CONFIRMS CA$932M NET PRESENT VALUE AND LOW-COST CONCENTRATE SUPPLY FOR PAK LITHIUM PROJECT · published 28 May 2025 Ref: Table 2: Summary of the Mineral Resource Estimate
|
| Underground - PAK | Inferred | 2.00 Mt | 2.19% Li2O | 0.11 Mt LCE | 30 Nov 2023 | Table 2: Summary of the Mineral Resource EstimateUnverified | notes (2)Source: FRONTIER LITHIUM'S FEASIBILITY STUDY CONFIRMS CA$932M NET PRESENT VALUE AND LOW-COST CONCENTRATE SUPPLY FOR PAK LITHIUM PROJECT · published 28 May 2025 Ref: Table 2: Summary of the Mineral Resource Estimate
|
| Area | Category | Tonnes (Mt) | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (% Li2O) | Contained (Mt LCE) | ||||||
| Total | Total Reserves | 31.13 Mt | 1.51% Li2O | 1.16 Mt LCE | 28 May 2025 | Table 3: Summary of Mineral Reserve EstimateUnverified | notes (5)Source: FRONTIER LITHIUM'S FEASIBILITY STUDY CONFIRMS CA$932M NET PRESENT VALUE AND LOW-COST CONCENTRATE SUPPLY FOR PAK LITHIUM PROJECT · published 28 May 2025 Ref: Table 3: Summary of Mineral Reserve Estimate
QA notes:
|
| Open Pit - PAK | Proved | 2.52 Mt | 1.97% Li2O | 0.12 Mt LCE | 28 May 2025 | Table 3: Summary of Mineral Reserve EstimateUnverified | |
| Open Pit - PAK | Probable | 1.43 Mt | 1.94% Li2O | 0.07 Mt LCE | 28 May 2025 | Table 3: Summary of Mineral Reserve EstimateUnverified | |
| Open Pit - Spark | Proved | 13.67 Mt | 1.51% Li2O | 0.51 Mt LCE | 28 May 2025 | Table 3: Summary of Mineral Reserve EstimateUnverified | |
| Open Pit - Spark | Probable | 13.51 Mt | 1.37% Li2O | 0.46 Mt LCE | 28 May 2025 | Table 3: Summary of Mineral Reserve EstimateUnverified | |
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.
Figures are on a 100% project basis unless a row carries the attrib chip; Frontier Lithium Inc. holds 92.5% of this project.