Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | 6.63 Mt | 1.75 g/t | 0.37 Moz | 08 June 2026 |
| Indicated | 9.35 Mt | 1.72 g/t | 0.52 Moz | 08 June 2026 |
| Inferred | 20.10 Mt | 1.34 g/t | 0.87 Moz | 08 June 2026 |
| Total Resources | 36.08 Mt | 1.51 g/t | 1.76 Moz | 08 June 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | |||||
| Measured | 6.63 Mt | 1.75 g/t | 0.37 Moz | 08 June 2026 | Table 1 – Granada Gold Project 2026 Mineral Resource EstimateUnverified | |
notes (2)Source: Granada Gold Announces 64% Increase In Measured And Indicated Mineral Resources To 890,600 OZ AU (15,982,000 Tonnes At 1.73 G/T AU) And 90% Increase In Inferred Mineral Resources To 865,500 OZ AU (20,096,000 Tonnes At 1.34 G/T AU) · published 23 June 2026 Ref: Table 1 – Granada Gold Project 2026 Mineral Resource Estimate
|
| Indicated | 9.35 Mt | 1.72 g/t | 0.52 Moz | 08 June 2026 | Table 1 – Granada Gold Project 2026 Mineral Resource EstimateUnverified | notes (2)Source: Granada Gold Announces 64% Increase In Measured And Indicated Mineral Resources To 890,600 OZ AU (15,982,000 Tonnes At 1.73 G/T AU) And 90% Increase In Inferred Mineral Resources To 865,500 OZ AU (20,096,000 Tonnes At 1.34 G/T AU) · published 23 June 2026 Ref: Table 1 – Granada Gold Project 2026 Mineral Resource Estimate
|
| Inferred | 20.10 Mt | 1.34 g/t | 0.87 Moz | 08 June 2026 | Table 1 – Granada Gold Project 2026 Mineral Resource EstimateUnverified | notes (2)Source: Granada Gold Announces 64% Increase In Measured And Indicated Mineral Resources To 890,600 OZ AU (15,982,000 Tonnes At 1.73 G/T AU) And 90% Increase In Inferred Mineral Resources To 865,500 OZ AU (20,096,000 Tonnes At 1.34 G/T AU) · published 23 June 2026 Ref: Table 1 – Granada Gold Project 2026 Mineral Resource Estimate
|
| Total Resources | 36.08 Mt | 1.51 g/t | 1.76 Moz | 08 June 2026 | derived from 3 rows | — |