These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 1.46 Mt | 1.08% | 0.02 Mt Cu | 16 Sept 2024 |
| Total Resources | 1.46 Mt | 1.08% | 0.02 Mt Cu | 16 Sept 2024 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Cu | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (% Cu) | Contained (Mt Cu) | ||||||
| Total | Inferred | 1.46 Mt | 1.08% | 0.02 Mt Cu | 16 Sept 2024 | Table 1 Summary of Inferred Mineral Resources on the Alwin Project - Total Mineral Resource EstimateUnverified | |
notes (3)Source: GSP Announces Initial Open Pit & Underground Mineral Resource Estimate for Alwin Project, British Columbia, Canada · published 04 Dec 2024 Ref: Table 1 Summary of Inferred Mineral Resources on the Alwin Project - Total Mineral Resource Estimate
QA notes:
|
| Total | Total Resources | 1.46 Mt | 1.08% | 0.02 Mt Cu | 16 Sept 2024 | derived from 1 row | — |
| Pit-Constrained | Inferred | 0.92 Mt | 1.13% | 0.01 Mt Cu | 16 Sept 2024 | Table 1 Summary of Inferred Mineral Resources on the Alwin ProjectUnverified | notes (2)Source: GSP Announces Initial Open Pit & Underground Mineral Resource Estimate for Alwin Project, British Columbia, Canada · published 04 Dec 2024 Ref: Table 1 Summary of Inferred Mineral Resources on the Alwin Project
|
| Underground | Inferred | 0.54 Mt | 0.98% | 0.01 Mt Cu | 16 Sept 2024 | Table 1 Summary of Inferred Mineral Resources on the Alwin ProjectUnverified | notes (2)Source: GSP Announces Initial Open Pit & Underground Mineral Resource Estimate for Alwin Project, British Columbia, Canada · published 04 Dec 2024 Ref: Table 1 Summary of Inferred Mineral Resources on the Alwin Project
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.