Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (ppm Li) | Contained (Mt LCE) | As at |
|---|---|---|---|---|
| Measured | 858.26 Mt | 990 ppm Li | 4.52 Mt LCE | 29 Apr 2024 |
| Indicated | 280.33 Mt | 891 ppm Li | 1.33 Mt LCE | 29 Apr 2024 |
| Inferred | 187.28 Mt | 820 ppm Li | 0.82 Mt LCE | 29 Apr 2024 |
| Total Resources | 1,038.22 Mt | 888 ppm Li | 4.91 Mt LCE | 29 Apr 2024 |
| Proved | 266.39 Mt | 1,147 ppm Li | 1.63 Mt LCE | 29 Apr 2024 |
| Probable | 21.26 Mt | 1,174 ppm Li | 0.13 Mt LCE | 29 Apr 2024 |
| Total Reserves | 287.65 Mt | 1,149 ppm Li | 1.76 Mt LCE | 03 Jan 2026 |
Sub-category rows are as disclosed (no Reserves-treatment netting); the Total rows honour the Resources treatment and Inferred-policy toggles, so components may not sum to the Total.
Dotted tonnes/grade are derived under the active Resources treatment: tonnes are netted of (or grossed by) the reserve tonnage alongside contained, and grade is re-derived as netted contained ÷ netted tonnes — not the published figures.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (ppm Li) | Contained (Mt LCE) | |||||
| Measured | 858.26 Mt | 990 ppm Li | 4.52 Mt LCE | 29 Apr 2024 | Mineral Resource Estimate tableUnverified | |
notes (7)Source: CENTURY LITHIUM REPORTS UPDATED FEASIBILITY STUDY WITH AFTER-TAX NPV OF $4.01 BILLION AND OPERATING COSTS OF $4,389 PER TONNE OF LITHIUM CARBONATE FOR THE ANGEL ISLAND LITHIUM PROJECT, NEVADA · published 23 Feb 2026 Ref: Mineral Resource Estimate table
QA notes:
|
| Indicated | 280.33 Mt | 891 ppm Li | 1.33 Mt LCE | 29 Apr 2024 | Mineral Resource Estimate tableUnverified | notes (7)Source: CENTURY LITHIUM REPORTS UPDATED FEASIBILITY STUDY WITH AFTER-TAX NPV OF $4.01 BILLION AND OPERATING COSTS OF $4,389 PER TONNE OF LITHIUM CARBONATE FOR THE ANGEL ISLAND LITHIUM PROJECT, NEVADA · published 23 Feb 2026 Ref: Mineral Resource Estimate table
QA notes:
|
| Inferred | 187.28 Mt | 820 ppm Li | 0.82 Mt LCE | 29 Apr 2024 | Mineral Resource Estimate tableUnverified | notes (7)Source: CENTURY LITHIUM REPORTS UPDATED FEASIBILITY STUDY WITH AFTER-TAX NPV OF $4.01 BILLION AND OPERATING COSTS OF $4,389 PER TONNE OF LITHIUM CARBONATE FOR THE ANGEL ISLAND LITHIUM PROJECT, NEVADA · published 23 Feb 2026 Ref: Mineral Resource Estimate table
QA notes:
|
| Total Resources | 1,038.22 Mt | 888 ppm Li | 4.91 Mt LCE | 29 Apr 2024 | derived from 3 rows
| — |
| Category | Tonnes (Mt) | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (ppm Li) | Contained (Mt LCE) | |||||
| Proved | 266.39 Mt | 1,147 ppm Li | 1.63 Mt LCE | 29 Apr 2024 | Mineral Reserve Estimate tableUnverified | notes (6)Source: CENTURY LITHIUM REPORTS UPDATED FEASIBILITY STUDY WITH AFTER-TAX NPV OF $4.01 BILLION AND OPERATING COSTS OF $4,389 PER TONNE OF LITHIUM CARBONATE FOR THE ANGEL ISLAND LITHIUM PROJECT, NEVADA · published 23 Feb 2026 Ref: Mineral Reserve Estimate table
QA notes:
|
| Probable | 21.26 Mt | 1,174 ppm Li | 0.13 Mt LCE | 29 Apr 2024 | Mineral Reserve Estimate tableUnverified | notes (6) |
| Total Reserves | 287.65 Mt | 1,149 ppm Li | 1.76 Mt LCE | 03 Jan 2026 | Mineral Resource and Reserve sectionUnverified | notes (4) |
Dotted Total-row tonnes/grade are derived under the active Resources treatment: tonnes netted of (or grossed by) the reserve tonnage alongside contained, grade re-derived as netted contained ÷ netted tonnes — not the published figures.