Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Li2O) | Contained (Mt LCE) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 50.38 Mt | 1.00% Li2O | 1.25 Mt LCE | 25 Sept 2024 |
| Total Resources | 50.38 Mt | 1.00% Li2O | 1.25 Mt LCE | 25 Sept 2024 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|
| Grade (% Li2O) | Contained (Mt LCE) | |||||
| Inferred | 50.38 Mt | 1.00% Li2O | 1.25 Mt LCE | 25 Sept 2024 | Initial Mineral Resource Estimate — press release bodyUnverified | |
notes (2)Source: LIFT Files NI 43-101 Technical Report on the Yellowknife Lithium Project, NWT, Canada · published 14 Nov 2024 Ref: Initial Mineral Resource Estimate — press release body
QA notes:
|
| Total Resources | 50.38 Mt | 1.00% Li2O | 1.25 Mt LCE | 25 Sept 2024 | derived from 1 row | — |