Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes / Vol | Grade (mg/L Li) | Contained (Mt LCE) | As at |
|---|---|---|---|---|
| Measured | 690.00 Mm³ | 571 mg/L Li | 2.09 Mt LCE | 10 July 2024 |
| Indicated | 180.00 Mm³ | 594 mg/L Li | 0.56 Mt LCE | 10 July 2024 |
| M&I = Measured + Indicated (overlaps both) | 870.00 Mm³ | 576 mg/L Li | 2.66 Mt LCE | 10 July 2024 |
| Inferred | 820.00 Mm³ | 468 mg/L Li | 2.04 Mt LCE | 10 July 2024 |
| Total Resources | 1,690.00 Mm³ (brine volume) | 523 mg/L Li | 4.70 Mt LCE | 10 July 2024 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
M&I is the issuer's printed Measured + Indicated subtotal — it overlaps the Measured and Indicated rows and is never added alongside them; the Total rows and every rollup already exclude it.
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes / Vol | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (mg/L Li) | Contained (Mt LCE) | ||||||
| Total | Measured | 690.00 Mm³ | 571 mg/L Li | 2.09 Mt LCE | 10 July 2024 | Table 1: Existing and Updated Resources Estimates at the Rio Grande Project | |
notes (4)Source: NOA Lithium Files Updated NI 43-101 Technical Report and Further Increases Its Mineral Resource Estimate by 24% At Rio Grande Project · published 10 July 2024 Ref: Table 1: Existing and Updated Resources Estimates at the Rio Grande Project
QA notes:
|
| Total | Indicated | 180.00 Mm³ | 594 mg/L Li | 0.56 Mt LCE | 10 July 2024 | Table 1: Existing and Updated Resources Estimates at the Rio Grande ProjectUnverified | notes (4)Source: NOA Lithium Files Updated NI 43-101 Technical Report and Further Increases Its Mineral Resource Estimate by 24% At Rio Grande Project · published 10 July 2024 Ref: Table 1: Existing and Updated Resources Estimates at the Rio Grande Project
QA notes:
|
| Total | M&I = Measured + Indicated (overlaps both) | 870.00 Mm³ | 576 mg/L Li | 2.66 Mt LCE | 10 July 2024 | Table 1: Existing and Updated Resources Estimates at the Rio Grande ProjectUnverified | notes (4)Source: NOA Lithium Files Updated NI 43-101 Technical Report and Further Increases Its Mineral Resource Estimate by 24% At Rio Grande Project · published 10 July 2024 Ref: Table 1: Existing and Updated Resources Estimates at the Rio Grande Project
QA notes:
|
| Total | Inferred | 820.00 Mm³ | 468 mg/L Li | 2.04 Mt LCE | 10 July 2024 | Table 1: Existing and Updated Resources Estimates at the Rio Grande Project — Total InferredUnverified | notes (4)Source: NOA Lithium Files Updated NI 43-101 Technical Report and Further Increases Its Mineral Resource Estimate by 24% At Rio Grande Project · published 10 July 2024 Ref: Table 1: Existing and Updated Resources Estimates at the Rio Grande Project — Total Inferred
QA notes:
|
| Total | Total Resources | 1,690.00 Mm³(brine volume) | 523 mg/L Li | 4.70 Mt LCE | 10 July 2024 | derived from 3 rows | — |
| Inferred | Inferred | 190.00 Mm³ | 535 mg/L Li | 0.53 Mt LCE | 10 July 2024 | Table 1: Existing and Updated Resources Estimates at the Rio Grande ProjectUnverified | notes (8)Source: NOA Lithium Files Updated NI 43-101 Technical Report and Further Increases Its Mineral Resource Estimate by 24% At Rio Grande Project · published 10 July 2024 Ref: Table 1: Existing and Updated Resources Estimates at the Rio Grande Project
QA notes:
|
| Sector I CSAMT Inferred | Inferred | 630.00 Mm³ | 450 mg/L Li | 1.51 Mt LCE | 10 July 2024 | Table 1: Existing and Updated Resources Estimates at the Rio Grande ProjectUnverified | notes (4)Source: NOA Lithium Files Updated NI 43-101 Technical Report and Further Increases Its Mineral Resource Estimate by 24% At Rio Grande Project · published 10 July 2024 Ref: Table 1: Existing and Updated Resources Estimates at the Rio Grande Project
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. “M&I” is the issuer's printed Measured + Indicated subtotal: it overlaps the Measured and Indicated rows and is never added alongside them. All derived totals and rollups on this site already exclude the overlapping rows.