Loading…
These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 5.00 Mt | 0.65 g/t | 0.10 Moz | 31 Dec 2025 |
| Total Resources | 5.00 Mt | 0.65 g/t | 0.10 Moz | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 5.00 Mt | 1.20 g/t | 0.20 Moz | 31 Dec 2025 |
| Total Resources | 5.00 Mt | 1.20 g/t | 0.20 Moz | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — |
| Category | Tonnes (Mt) | Grade (% Cu) | Contained (Mt Cu) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 5.00 Mt | 0.14% | 0.01 Mt Cu | 31 Dec 2025 |
| Total Resources | 5.00 Mt | 0.14% | 0.01 Mt Cu | 31 Dec 2025 |
| Proved | — | — | — | — |
| Probable | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Category | Tonnes (Mt) | Au | Ag | Cu | As at | Source | Provenance | |||
|---|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | Grade (% Cu) | Contained (Mt Cu) | |||||
| Inferred | 5.00 Mt | 0.65 g/t | 0.10 Moz | 1.20 g/t | 0.20 Moz | 0.14% | 0.01 Mt Cu | 31 Dec 2025 | ||
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| — |
| Total Reserves | — | — | — | — |
notes (2)Source: PAN GLOBAL FILES NI 43-101 TECHNICAL REPORT FOR INITIAL MINERAL RESOURCE ESTIMATES AT THE ESCACENA PROJECT, SOUTHERN SPAIN · published 12 Feb 2026 Ref: Highlights — Cañada Honda (Au-Cu-Ag) Mineral Resources
|
| Total Resources | 5.00 Mt | 0.65 g/t | 0.10 Moz | 1.20 g/t | 0.20 Moz | 0.14% | 0.01 Mt Cu | 31 Dec 2025 | derived from 1 row | — |