Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Li2O) | Contained (Mt LCE) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 0.01 Mt | 1.30% Li2O | 0.45 kt LCE | 30 May 2025 |
| Total Resources | 0.01 Mt | 1.30% Li2O | 0.45 kt LCE | 30 May 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (% Li2O) | Contained (Mt LCE) | ||||||
| Total | Total Resources | 0.01 Mt | 1.30% Li2O | 0.45 kt LCE | 30 May 2025 | derived from 1 row | |
| — |
| In-pit (West Joe dykes) | Inferred | 0.01 Mt | 1.30% Li2O | 0.45 kt LCE | 30 May 2025 | Table 1 – Case Lake Cesium Project Deposit In-pit Mineral Resource EstimateUnverified | notes (3)Source: MAIDEN MINERAL RESOURCE ESTIMATE CONFIRMS CASE LAKE AS THE WORLD'S FOURTH LARGEST CESIUM RESOURCE · published 05 June 2025 Ref: Table 1 – Case Lake Cesium Project Deposit In-pit Mineral Resource Estimate
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.