Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Li2O) | Contained (Mt LCE) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | — | — | — | — |
| Inferred | 295.00 Mt | 1.36% Li2O | 9.92 Mt LCE | 20 Apr 2026 |
| Total Resources | 295.00 Mt | 1.36% Li2O | 9.92 Mt LCE | 20 Apr 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Li | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (% Li2O) | Contained (Mt LCE) | ||||||
| Total | Inferred | 295.00 Mt | 1.36% Li2O | 9.92 Mt LCE | 20 Apr 2026 | Body text: 'combined inferred mineral resource of 295 Mt grading 1.36% Li2O'Unverified | |
notes (3)Source: Q2 Metals Files Technical Report for the Mineral Resource Estimate for the Cisco Lithium Project · published 04 June 2026 Ref: Body text: 'combined inferred mineral resource of 295 Mt grading 1.36% Li2O'
QA notes:
|
| Total | Total Resources | 295.00 Mt | 1.36% Li2O | 9.92 Mt LCE | 20 Apr 2026 | derived from 1 row | — |
| Open Pit | Inferred | 270.00 Mt | 1.36% Li2O | 9.08 Mt LCE | 20 Apr 2026 | Body text: 'The current Inferred Mineral Resource Estimate on the Cisco Deposit'Unverified | notes (3)Source: Q2 Metals Files Technical Report for the Mineral Resource Estimate for the Cisco Lithium Project · published 04 June 2026 Ref: Body text: 'The current Inferred Mineral Resource Estimate on the Cisco Deposit'
QA notes:
|
| Underground | Inferred | 24.00 Mt | 1.34% Li2O | 0.80 Mt LCE | 20 Apr 2026 | Body text: 'an additional underground-constrained resource of 24 Mt grading 1.34% Li2O'Unverified | notes (3)Source: Q2 Metals Files Technical Report for the Mineral Resource Estimate for the Cisco Lithium Project · published 04 June 2026 Ref: Body text: 'an additional underground-constrained resource of 24 Mt grading 1.34% Li2O'
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.