These choices persist and are added to shared URLs.
Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 5.57 Mt | 2.07 g/t | 0.37 Moz | 05 Feb 2026 |
| Inferred | 4.05 Mt | 3.38 g/t | 0.44 Moz | 05 Feb 2026 |
| Total Resources | 9.62 Mt | 2.62 g/t | 0.81 Moz | 05 Feb 2026 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | ||||||
| Total | Total Resources | 9.62 Mt | 2.62 g/t | 0.81 Moz | 05 Feb 2026 | derived from 3 rows
| |
| — |
| Open Pit | Indicated | 5.57 Mt | 2.07 g/t | 0.37 Moz | 05 Feb 2026 | Table 1. Rebel Mineral Resource EstimateUnverified | notes (1)Source: Renegade Gold Files NI 43-101 Technical Report for the Rebel Gold Deposit, Red Lake District, Ontario · published 01 Apr 2026 Ref: Table 1. Rebel Mineral Resource Estimate
|
| Open Pit | Inferred | 2.50 Mt | 2.42 g/t | 0.19 Moz | 05 Feb 2026 | Table 1. Rebel Mineral Resource EstimateUnverified | notes (1)Source: Renegade Gold Files NI 43-101 Technical Report for the Rebel Gold Deposit, Red Lake District, Ontario · published 01 Apr 2026 Ref: Table 1. Rebel Mineral Resource Estimate
|
| Underground | Inferred | 1.55 Mt | 4.91 g/t | 0.25 Moz | 05 Feb 2026 | Table 1. Rebel Mineral Resource EstimateUnverified | notes (1)Source: Renegade Gold Files NI 43-101 Technical Report for the Rebel Gold Deposit, Red Lake District, Ontario · published 01 Apr 2026 Ref: Table 1. Rebel Mineral Resource Estimate
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.