Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (g/t Au) | Contained (Moz Au) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 22.18 Mt | 0.07 g/t | 0.05 Moz | 18 Aug 2020 |
| Inferred | 15.06 Mt | 0.12 g/t | 0.06 Moz | 30 Apr 2025 |
| Total Resources | 37.24 Mt | 0.09 g/t | 0.11 Moz | 30 Apr 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
| Category | Tonnes (Mt) | Grade (g/t Ag) | Contained (Moz Ag) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 22.18 Mt | 42.10 g/t | 30.02 Moz | 18 Aug 2020 |
| Inferred | 15.06 Mt | 51.62 g/t | 25.00 Moz | 30 Apr 2025 |
| Total Resources | 37.24 Mt | 45.95 g/t | 55.02 Moz | 30 Apr 2025 |
| Proved | — | — | — | — |
| Probable |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Au | Ag | As at | Source | Provenance | ||
|---|---|---|---|---|---|---|---|---|---|
| Grade (g/t Au) | Contained (Moz Au) | Grade (g/t Ag) | Contained (Moz Ag) | ||||||
| Total | Total Resources | 37.24 Mt | 0.09 g/t | 0.11 Moz | 45.95 g/t | 55.02 Moz | 30 Apr 2025 | derived from 4 rows | |
| — |
| — |
| — |
| Total Reserves | — | — | — | — |
| — |
| Leach Pad | Indicated | 22.18 Mt | 0.07 g/t | 0.05 Moz | 42.10 g/t | 30.02 Moz | 18 Aug 2020 | Table 2 – Candelaria Leach Pad mineral resources (Indicated)Unverified | notes (3)Source: SILVER ONE ANNOUNCES IN-GROUND MINERAL RESOURCE ESTIMATE PREPARED IN ACCORDANCE WITH NI 43-101 ON ITS CANDELARIA PROJECT, NEVADA · published 06 May 2025 Ref: Table 2 – Candelaria Leach Pad mineral resources (Indicated)
QA notes:
|
| Leach Pad | Inferred | 11.45 Mt | 0.10 g/t | 0.04 Moz | 41.80 g/t | 15.40 Moz | 18 Aug 2020 | Table 2 – Candelaria Leach Pad mineral resources (Inferred)Unverified | notes (2)Source: SILVER ONE ANNOUNCES IN-GROUND MINERAL RESOURCE ESTIMATE PREPARED IN ACCORDANCE WITH NI 43-101 ON ITS CANDELARIA PROJECT, NEVADA · published 06 May 2025 Ref: Table 2 – Candelaria Leach Pad mineral resources (Inferred)
|
| Open Pit (Mt. Diablo and Northern Belle) | Inferred | 2.96 Mt | 0.18 g/t | 0.02 Moz | 68.00 g/t | 6.46 Moz | 30 Apr 2025 | Table 1 – Candelaria in-ground, underground, and stockpiles mineral resource estimatesUnverified | notes (2)Source: Silver One Reports Filing of Technical Report to Mineral Resource Estimate on Its Candelaria Project, Nevada · published 19 June 2025 Ref: Table 1 – Candelaria in-ground, underground, and stockpiles mineral resource estimates
|
| Underground | Inferred | 0.65 Mt | 0.24 g/t | 0.01 Moz | 150.00 g/t | 3.14 Moz | 30 Apr 2025 | Table 1 – Candelaria in-ground, underground, and stockpiles mineral resource estimatesUnverified | notes (3)Source: Silver One Reports Filing of Technical Report to Mineral Resource Estimate on Its Candelaria Project, Nevada · published 19 June 2025 Ref: Table 1 – Candelaria in-ground, underground, and stockpiles mineral resource estimates
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.