Whole-project rollup at the latest vintage per category: printed project-level rows are preferred, and mining areas are summed (tonnes-weighted grade) only where the issuer prints no project-level row. Per-area and per-source detail in the Current R&R table below.
| Category | Tonnes (Mt) | Grade (% Ni) | Contained (Mt Ni) | As at |
|---|---|---|---|---|
| Measured | — | — | — | — |
| Indicated | 10.50 Mt | 0.44% | 0.05 Mt Ni | 03 Mar 2025 |
| Inferred | — | — | — | — |
| Total Resources | 10.50 Mt | 0.44% | 0.05 Mt Ni | 03 Mar 2025 |
| Proved | — | — | — | — |
| Probable | — | — | — | — |
| Total Reserves | — | — | — | — |
Percentile of this project's current total Resource among covered peers (P100 = largest / highest grade). Basis and Inferred toggles apply.
| Area | Category | Tonnes (Mt) | Ni | As at | Source | Provenance | |
|---|---|---|---|---|---|---|---|
| Grade (% Ni) | Contained (Mt Ni) | ||||||
| Total | Indicated | 10.50 Mt | 0.44% | 0.05 Mt Ni | 03 Mar 2025 | Table 1 - Aurora Nickel Project Mineral Resource StatementUnverified | |
notes (3)Source: transition.inc Announces Updated Mineral Resource Estimate for the Aurora Nickel Project,- 10.5M tonnes at an Average 0.44% Ni grade- Near-Surface Mineralization, in Timmins, Ontario · published 03 Mar 2025 Ref: Table 1 - Aurora Nickel Project Mineral Resource Statement
QA notes:
|
| Total | Total Resources | 10.50 Mt | 0.44% | 0.05 Mt Ni | 03 Mar 2025 | derived from 1 row | — |
| Aurora North | Indicated | 8.50 Mt | 0.40% | 0.03 Mt Ni | 03 Mar 2025 | Table 1 - Aurora Nickel Project Mineral Resource StatementUnverified | notes (3)Source: transition.inc Announces Updated Mineral Resource Estimate for the Aurora Nickel Project,- 10.5M tonnes at an Average 0.44% Ni grade- Near-Surface Mineralization, in Timmins, Ontario · published 03 Mar 2025 Ref: Table 1 - Aurora Nickel Project Mineral Resource Statement
QA notes:
|
| Aurora South | Indicated | 2.00 Mt | 0.65% | 0.01 Mt Ni | 03 Mar 2025 | Table 1 - Aurora Nickel Project Mineral Resource StatementUnverified | notes (3)Source: transition.inc Announces Updated Mineral Resource Estimate for the Aurora Nickel Project,- 10.5M tonnes at an Average 0.44% Ni grade- Near-Surface Mineralization, in Timmins, Ontario · published 03 Mar 2025 Ref: Table 1 - Aurora Nickel Project Mineral Resource Statement
QA notes:
|
Rows are hierarchical, not additive — do not sum a column across rows. Whole-project rows (Area “Total”) already contain the indented named-area rows beneath them, and an issuer's printed per-deposit total can itself contain other listed areas. All derived totals and rollups on this site already exclude the overlapping rows.